surveying 1, Civil Engineering

Different tape corrections
Posted Date: 8/16/2016 11:10:01 AM | Location :







Related Discussions:- surveying 1, Assignment Help, Ask Question on surveying 1, Get Answer, Expert's Help, surveying 1 Discussions

Write discussion on surveying 1
Your posts are moderated
Related Questions
Maintenance of Concrete Roads: The main defects that show up in a concrete road are : (a) cracks (b) loss of sealant (c) spalling at joints (d) loss of texture

#question a pilot entering a bay on course 60.3 degrees at speed 12 miles per hour sees a light bearing 37.3 true and 20 minutes later he sees it bearing 20.0 degrees true. if he k

Calculate the ultimate compressive strength A 6 in. by 12 in. cylinder failed at an axial compressive force of 120,000-lbf, at 28 days. Calculate the ultimate compressive stren

a) Explain with a neat sketch how will you carry out the wash boring method of soil exploration. What are its merits and demerits? b) Describe the terms 'inside clearance' and '

Q. What is Ceramic mosaic and Chequered Cement tiles? Chequered Mosaic tiles - Repairs to steps of F O Bs should be done only with Chequered Mosaic tiles. Ceramic m

Test required before laying or after laying.

Determine the Statements about Unit Area or Borrow Pit? Ans: I.  Sometimes called Average Depth II. Works well for volumes for building sites and surface mines III. Needs

Pre-tensioned concrete elements It is the act of transferring the stress in prestressing tendons to the concrete member. In the case of pre-tensioned concrete elements, this st


The regulations and specifications that followed for compaction works for earth dam in Oman