who to we calculate the RL at first point.
Posted Date: 11/22/2012 9:17:46 PM | Location : Pakistan







Related Discussions:- Survey, Assignment Help, Ask Question on Survey, Get Answer, Expert's Help, Survey Discussions

Write discussion on Survey
Your posts are moderated
Related Questions
Define Dual frequency and colour fathometer - Sounding/Sensing Devices? Dual Frequency and Colour Fathometers can be used to detect refill in the scoured area since more than o

Question Advantages of casings for mini-piles ? Answer Left-in casings for mini-piles have next advantages as follows- (i) recover resistance to corrosion of ma

explain registers and factors influencing them

write the types of foundation for black cotton soil and exxplin with drowing?


A loading test was conducted with a 300 mm square plate at depth of 1 m under the ground surface in pure clay deposit. The water table is situated at a depth of 4 m below the groun

The construction of a new bakery requires the property development firm to pay the municipality the cost to expand its sewage treatment plant. In addition to the expansion costs, t

The material that have lowest resistivity is Answer: Silver is the material

Define Underwater Inspection of steel or cast iron structures? Underwater Inspection of steel/cast iron structures may be carried out as under: i. Start the inspection at sp

manufacture of cement by dry process