State the ground water levels, Civil Engineering

Ground Water Levels

The location of the ground water level is essential for deep excavation, water-logged areas. The existing wells in the nearby vicinity of the proposed site 'md bore holes should be used for recording the ground water table. The chemical analysis of ground water is also suggested for the determination of chemical constituents. If ground water is contaminated, the borings should be plugged. Borings through clay layers into granular subsoils which contain ground water table should also be plugged since this state represents a confined aquifer.

 

Posted Date: 9/3/2013 5:42:34 AM | Location : United States







Related Discussions:- State the ground water levels, Assignment Help, Ask Question on State the ground water levels, Get Answer, Expert's Help, State the ground water levels Discussions

Write discussion on State the ground water levels
Your posts are moderated
Related Questions
Stress corrosion of pre-stressing steel Stress corrosion is crystalline cracking of metals under tensile stresses in the presence of corrosive agents. Conditions for stress cor

obstacle to ranging but not chaining inthat when line may not visible from intermediate point pls if required explain with diagram

Question What is the major purpose of carrying out water absorption test for precast concrete pipes? Answer Cement will mix with additional water than is compulsory t

How to calculate the centroid of parabola?

Obstacles which can be ranged

Testing of Aggregates: For use in pavement, road aggregates have to be strong, durable and of good shape. A well-graded aggregates adds to the stability of the layer. The fol

CEMENT Cement is a normally used binding material in the construction. By burning a mixture of argillaceous (clay) and calcarious (calcium)  material at a very high temperature

What is the California bearing ratio for granular A, Granular B, 19 mmm Crusher Run Limestone, 50 mm Crusher run limestone, HL3 and HL8 Asphalt?

what does a civil engineer

On a 5-acre level terrain building site, an earthwork contractor has instructed her crew to strip and grub the topsoil of a 60,000-ft 2 proposed building pad to a minus 2-ft sub-g