Specification of wood work for door, Civil Engineering

Assignment Help:

Q. Specification of Wood work for Door?

1. General - Timber for door, window and ventilators frames shall be as specified. Timber shall be sawn in the direction of the grains. All member of a frame shall be of the same species of timber and shall be straight without any warp or bow. Frames shall have smooth, well-planed (wrought) surfaces the depth of the rebate for housing the shutter shall be 15 mm, and the width of the rebate shall be equal to the thickness of the shutters. A tolerance of ± 3 mm and 2 mm shall be permitted in the speci¬fied finished dimensions of timber sections in frames.

2. Joints - The frames shall have dovetail joints. The Jamb post shall be through tenoned into the mortise of the transoms to the full thickness of the transoms and the thickness of the tenon shall be not less than 2.5 cm. The tenons shall closely fit into the mortise without any wedging or filling. The contact surface of tenon and mortise before putting together shall be glued with polyvinyl acetate dispersion based adhesive and pinned with 10 mm dia hard wood dowels, or bomboo pins or star shaped metal pins. The joints shall be at right angles when checked from the inside surfaces of the respective members. The joints shall be pressed in position.

3. Fixing of frames - The frames shall be got inspected and approved by the Enginee-in-Charge before being painted, The surface of the frames abutting masonry or concrete and the portions of the frames embedded in floors shall be given a coating of coal tar. Frames shall be fixed to the abutting masonry or concrete with minimum of three holdfasts or metallic fastners as specified.

4. Measurements - Wood work wrought, framed and fixed shall be measured for finished dimension without any allowance for the wastage or for dimensions beyond specified dimension without any allowance for the wastage or for dimensions beyond specified dimensions.


Related Discussions:- Specification of wood work for door

Explain the perception reaction time, Explain the Perception Reaction Time ...

Explain the Perception Reaction Time A significant variable in the successful processing and use of information is the speed with which this is done. Perception-Reaction Time (

Define diving equipments for underwater inspection of bridge, Define Diving...

Define Diving Equipments for Underwater Inspection of Bridge? Generally two types of diving, Scuba diving and surface supplied air diving, is employed in underwater inspection

Survey, how to draw longitudinal profile

how to draw longitudinal profile

Specification of flooring for heavy repair shed, Q. Specification of Floori...

Q. Specification of Flooring for heavy repair shed? Scope for use - For flooring for heavy repair shed, Surface hardened concrete flooring can used. In this type of flooring,

Surveying, Distance ABC was measured with a 30m. Chain tested and found to ...

Distance ABC was measured with a 30m. Chain tested and found to be correct in the beginning of the work .after measuring AB=1.2 km chain was found to be 10 cm. To long chaining was

Define the process of eccentric prestressing, Define the proess of Eccentri...

Define the proess of Eccentric Prestressing In this form of prestressing, the centroid of cross-sectional areas of tendons is not located at the centroid of the cross-section.

Foundation, Explain briefly shallow foundation?

Explain briefly shallow foundation?

Finite Element Analysis- MATLAB problem, I am currently enrolled in a gradu...

I am currently enrolled in a graduate Civil Engineering course in Finite Element Analysis. The final assignment and project both deal with coding in MATLAB and I am having great di

Fore bearing, find out the interior angleS with diagrame LINE AB, BC, CD, D...

find out the interior angleS with diagrame LINE AB, BC, CD, DE, EA Fore bearing 60''30" , 122'' , 46'' , 205''30" , 300''

Application of embankment condition for drainage design, Q. Application of ...

Q. Application of embankment condition for drainage design? In considering loads on buried pipeline, there are generally two scenarios: narrow trench condition and embankment (

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd