Space communication - application of software defined radio, Electrical Engineering

Space communication - Application of Software Defined Radio

Software defined radio can save cost of missions while constructing multiple mode, multiple band radio systems that can be upgraded using software. A common hardware is used for performing multiple functions through up gradation of software thus reducing the number of radios needed for a mission. If requirements change prior to the launch of an orbit, the software can be upgraded faster and easier than hardware. If an orbit fails, the software can be reconfigured. Thus, with minimal use of hardware, the total weight and cost of space hardware is reduced.

Posted Date: 3/30/2013 7:03:34 AM | Location : United States







Related Discussions:- Space communication - application of software defined radio, Assignment Help, Ask Question on Space communication - application of software defined radio, Get Answer, Expert's Help, Space communication - application of software defined radio Discussions

Write discussion on Space communication - application of software defined radio
Your posts are moderated
Related Questions
A three-phase, 4160 V, 60 Hz, 3000 kVA generator supplies the following three phase loads:  A 00 kVA at .7 pf lagging, D 00 kVA at .9 pf lagging, and C 50 kVA at unity pf.

(a) Average rainfall during the month of January is found to be R mm. A Class A pan evaporation recorded an average of [7 + ( R /100)] mm/day near an irrigation reservoir. The av

how fet transistor works in self bias

Q. The flux in a magnetic core is alternating sinusoidally at a frequency of 500 Hz. The maximum flux density is 1 T. The eddy-current loss then amounts to 15W. Compute the eddy-cu

what is fuck

DAD Double Add Instruction The contents of register  R P are added  to the  contents  of HL register pair  and results of addition is stored  in HL register pair. R P   may b

Commercial Losses in Electrical Systems Commercial losses are caused by pilferage, theft, defective meters, and errors in meter reading and in estimating un-metered supply of

There is a force on the plunger required to do to move it into or out of the gap and work must be done by or against this force. The conservation of energy dictates that the change

I need the solutions for this assignment