simplex, Operation Research

Maximize Z = 2x - 7y subject
-2x + 3y = 3
4x + 5y >= 10
6x + 7y <= 3
4x + 8y >= 5
Posted Date: 12/22/2012 10:15:10 AM | Location : Malaysia







Related Discussions:- simplex, Assignment Help, Ask Question on simplex, Get Answer, Expert's Help, simplex Discussions

Write discussion on simplex
Your posts are moderated
Related Questions
Statement of Hypothesis The  two hypothesis  i  ,e,  null hypothesis  (H 0 ) and Alternative Hypothesis (H 1 ) are so  constructed  that if  one is  correct the other  is wron

words each) Q2. Six Operators are to be assigned to five jobs with the cost of assignment in Rs. given in the matrix below. Determine the optimal assignment. Which operator will ha

Solve by simplex method Maximize Z = 5x 1 + 3x 2 Subject to 3x 1 + 5x 2 ≤ 15 5x 1 + 2x 2 ≤ 10 &         x 1 ≥ 0, x 2  ≥ 0 [Ans. Max Z = 235/19

How to solve linear programming problems using simplex method introducing slack variable,surplus variable and artificial variable

six operators are to be assigned to the 5 jobs with the cost of assignments

#what are the methods of OR ?

Maximize p = (3)x + 2y subject to 2x + y 3x + 4y >= 12

application area of linear programing problem

Step 1: Research Towers of Hanoi problem The Towers of Hanoi is a problem frequently used to teach recursive programming techniques. Step 2: Run the assembly code from Hanoim

what are the characteristics of operation research