Simo chart flow diagram , Operation Research

SIMO Chart Flow Diagram

The  flow  diagram  is a drawing  indicating  the paths  of men  materials  or components on a scale  plan of  the work  area, department or  factory. The  first step is to prepare a flow  of the  work  area to  scale and position  the machines and other plants  correctly. The activities  alt the  various work area  are then indicated by their numbered symbol. The paths  followed in transport are shown  by joining  the symbol  in sequence by a line which represents as nearly as possible the paths  of movement of the subject concerned. The  direction of  movement  is shown  by the numbered transport symbols which form part of the flow lines. An example  of a flow diagram is shown  in figure

(A) where  the movement  of a subject  covers  several floor levels a three dimensional flow  diagram  is drawn  to study  the movement  on several floors .figure(b) shows  a three dimensional  flow

 

         21_SIMO Chart.png

                    figure Two Dimenslonal flow  Diagram           figure  (b) threee Dimenslonal

Posted Date: 3/5/2013 12:02:55 AM | Location : United States







Related Discussions:- Simo chart flow diagram , Assignment Help, Ask Question on Simo chart flow diagram , Get Answer, Expert's Help, Simo chart flow diagram Discussions

Write discussion on Simo chart flow diagram
Your posts are moderated
Related Questions
significance and scope of operation resarch in morden management?

#question.Solve the following Linear Programming Problem using Simple method. Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = 2 X1, X2 = 0.

significance of operation research in modern management

A company uses 4 pounds of resource 1 to make each unit of X1 and 3 pounds of resource 1 to make each unit of X2. There are only 150 pounds of resource 1 available. Which of the fo

. A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper

difference between simplex solution procedure for maximisation and minimisation

Question 1 X Ltd. has Unit C which is not functioning satisfactorily. The following are the details of its fixed assets: Asset Date of acquisiti

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

Six Operators are to be assigned to five jobs with the cost of assignment in Rs. given in the matrix below. Determine the optimal assignment. Which operator will have no assignment