In reclamation involving large volumes of fill and tight programme, shall engineers use marine fill or mud extracted from land borrow area as filling material?

 There are two benefits of adopting marine fill over mud extracted from land borrow area:

(a)  In certain land borrow areas, it includes breaking up of rock to suitable sizes for reclamation and production rate isn't high. With modern equipment for dredging and placing marine fill, the filling rate is much higher.  

(b) Cost incurred for breaking up of rock to suitable sizes for reclamation is very expensive whereas the cost of hydraulic filling with marine fill is lower.


Related Discussions:- Show the benefits of adopting marine fill

Rcc, how many rcc is use for 1 brass?

how many rcc is use for 1 brass?

What is the thickness of the concrete seal needed, Design a Cylindrical Ope...

Design a Cylindrical Open Caisson to be sunk by 30 m of sand to support a load of 50 MN. The allowable bearing pressure is 1700 kN/m 2 . Test the feasibility of sinking the caisson

Determine about the prestressed concrete, Determine about the prestressed c...

Determine about the prestressed concrete In prestressed concrete the most important parameter is the prestressing force. Ifthe prestressing force reduces with time, prestresses

Explain in detail about textural classification, Explain in detail about  ...

Explain in detail about  Textural classification. Sketch neatly the Casagrande's plasticity chart indicating several aspects. How would you use it in classifying the fine graine

Internal force of preloaded fasteners, Q. Internal force of preloaded faste...

Q. Internal force of preloaded fasteners? Force in a bolt in a bolted joint relies on the preloading force applied to it at the time of the tightening operation. For example, w

State the ultimate load capacity of the pile group, A group of 16 piles of ...

A group of 16 piles of 50 cm diameter is arranged with a centre to centre spacing of 1.0 m. The piles are 9 m long and are embedded in soft clay with cohesion 30 kN/m 2 . Bearing r

Surveying, length of the line measured with 20m chain found to be 250m.calc...

length of the line measured with 20m chain found to be 250m.calculate true length if the chain was 10cm long

Show the settlement due to vibration, Q. Show the Settlement due to Vibrati...

Q. Show the Settlement due to Vibration? The foundation resting on cohesionless soil and subjected to vibrations will result in settlements of higher magnitude. In sandy soil

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd