Short term scheduler, Computer Network Security

Short term Scheduler function, also shown as a dispatcher runs most frequently, and creates the finest-grained decision of which program could run next. This scheduler is called whenever an event happens. It will lead to interruption of one program by preemption.

 

1841_Short term scheduler.png

Posted Date: 8/20/2012 3:26:40 AM | Location : United States







Related Discussions:- Short term scheduler, Assignment Help, Ask Question on Short term scheduler, Get Answer, Expert's Help, Short term scheduler Discussions

Write discussion on Short term scheduler
Your posts are moderated
Related Questions
(a) Describe briefly the difference between flow control and congestion control in relation to a connection-oriented protocol such as TCP. (b)  What is the initial rate of data

The world has to deal with newly released vulnerabilities on a daily basis.  These vulnerabilities eventually lead to active exploits of systems, and it is our job as cyber securit

Problem: (a) What is the minimum length of a password that could be considered to be "strong" in the context of today's computing power? (b) The security of a PIN system,

There are various benefits related with providing the security. They are given below,  (i)  Confidentiality/ Privacy (ii)  Integrity  (iii) Availability (iv)Authenticatio

BUS TOPOLOGY In a bus topology all devices are attached to a single long cable and any device can send data to any other device. For this function, coordination is needed to d

Is standard TCP effective in mobile wireless networks that operate with the IEEE 802.11 wireless local area network protocol?Discuss the issue

SUCCESS OF IP:  IP has accommodated dramatic modification since real design. But basic rules are still appropriate today. There are many new kinds of hardware. SCALING:

how to encryt the data in plaintext cipher

Problem: (a) What is a firewall and which are its most important tasks? (b) What is the difference between default deny and default permit? Which advantages and disadvanta

QUESTION 1 Risk analysis helps companies prioritize their risks and shows management the amount of money that should be applied to protecting against those risks in a sensib