Scraper launchers and receivers, Mechanical Engineering

Assignment Help:

Q. Scraper Launchers and Receivers?

Scraper launchers and receivers associated with the pipelines shall be located in open, well-ventilated areas with the opening directed away from pressurized or other critical equipment, where practicable. Mechanical handling facilities shall be provided for spheres, scrapers (also commonly known as "pigs") and line logging devices.

Elevations, relative to grade, of launchers and receivers shall be kept to a minimum, but shall be of sufficient height to allow contents of drain lines to be observed. Launcher and receiver areas are located close to the main pipeline entry and exit points of the plant. The loading and unloading end of these units should point away from other facilities. This equipment should be within a curbed area with wash down facilities. As launchers and receivers are operated whilst adjacent plant is still 'live', safe spacing needs to be maintained.

Slug catchers are located close to the gas pipeline entry point to the plant and are designed to accommodate slugs of liquid that may be present in the gas supply. They can be either vessel type or for larger flows a multipipe type slug catcher can be utilized, both are generally above ground. The multipipe type can occupy a considerable plot area.

Both the launcher and receiver and slug catcher areas can have their own security fence. This can act as a physical code break between on-plot process and pipeline design codes.


Related Discussions:- Scraper launchers and receivers

Design bulk materials storage, Q. Design Bulk Materials Storage? Consid...

Q. Design Bulk Materials Storage? Consideration shall be given to providing access to safety showers in areas of hazardous bulk material handling and storage. Where bulk handli

Find out the moment of inertia of a triangular area, Find out the Moment of...

Find out the Moment of Inertia of a triangular area: Find out the Moment of Inertia of a triangular area ABC with base b and height d around its base BC. Therefore or otherwis

Impact testing, Charpy impact tests, when required shall comply. Impact ...

Charpy impact tests, when required shall comply. Impact tests shall be conducted at the minimum design metal temperature or at a lower temperature and shall meet or exceed energ

Physics, calculate wavelength fpr monocromatic light using newtons ring exp...

calculate wavelength fpr monocromatic light using newtons ring experiment notes

Grinder-tool and equipment , Grinder: Grinders are used to sharpen the cut...

Grinder: Grinders are used to sharpen the cutting edges of the tools. They are basically fast rotating grinding wheels carried at one or two ends of a shaft. The grinding wheel ar

Short-term scheduling and control, Short-Term Scheduling And Control Th...

Short-Term Scheduling And Control The major objective at this stage is to make sure the efficient and smooth operation of the system in the event of unforeseen disturbances. Th

Derive the characteristic equations of motion, Derive the characteristic eq...

Derive the characteristic equations of motion for the underdamped, critical damped and overdamped free damped vibration system. Write short notes on i. Fourier series and har

Write the differences between reaction and impulse turbine, (a) Show that t...

(a) Show that the force exerted by a jet of water on an inclined fixed plate in the dissection of jet is given by fx = .a.v 2 . sin 2 θ. Where a is area of jet, v is velocity of j

Discover the suitable diameter of the shaft, Discover the suitable diameter...

Discover the suitable diameter of the shaft: A shaft is required to fail while the torque on the shaft is 20 kN-m. Discover the suitable diameter of the shaft of the modulus o

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd