Scheduling - aggregate planning, Operation Management

Scheduling - Aggregate Planning

Meaning and Definition

Scheduling may be defined as the assignment of work to the facility with the specification of times ,and the sequence in which the work is to be done. Scheduling is actually time phasing of loading. The facility may be man power machine or both. Scheduling deals with orders and machine s it determines which order will be taken up on which machine in which department at what time and by which operator. Scheduling may also be defined as the fitting of specific jobs into a general time table so mat orders may be manufacturing in accordance with the contractual liability, or in mass production so that each component may arise at and enter into assembly in the orders and at the time required.

As per to sprigel and lansburg
"Scheduling includes establishing the amount of work to be done and the time while each element of the work will start.

As per to Kimball and kimabll :"The determination of time that is required to carry out every operation and as well the time required to perform the entire series as routed is scheduling ."

Objectives of Scheduling

1.Scheduling aims to achieve the required rate of output with a minimum of delay and disruption in processing.
2.To provide quantities of goods necessary to maintain finished inventories at levels predetermined to meet delivery commitments.
3. The aim of loading and scheduling is to have maximum utilization of men machines and materials by maintaining a free flow of materials along the production line.
4.To prevent unbalanced allocation of time among production departments or work centres with a view to eliminate idle capacity.
5. To keep the production cost minimum.

Posted Date: 2/1/2013 7:02:03 AM | Location : United States







Related Discussions:- Scheduling - aggregate planning, Assignment Help, Ask Question on Scheduling - aggregate planning, Get Answer, Expert's Help, Scheduling - aggregate planning Discussions

Write discussion on Scheduling - aggregate planning
Your posts are moderated
Related Questions
An Electric Company estimates its demand trend line (in millions of kilowatt hours) to be D = 79 + 0.52 Q, where Q refers to the sequential quarter number and Q=1 for winter 2000.

Line Balancing Line balancing is arranging a production line so that there is an even flow of production from one work station to the next i, e, so that there are no delays at a

Consider the table below. This time, the historical profitability of eight locations is listed in the table. Devise a regression equation and predict the profitability of a new sit

A manager at an architectural firm receives a call from a local newspaper. The reporter wonders how the firm wishes to respond to calls from two of its employees alleging racial di


Consider how these 10 Golden Rules apply to all projects and apply three of them to your project.

1. What can top managers do to maximize chances for success here? 2. Cisco went live with ERP in a big bang fashion, which is inherently risky. How did Cisco mitigate this risk?

Q1 Evaluate the service to club members and casual flyers by completing a table similar to Table 3.1. Q2 Chart the five performance objectives to show the dif¬fering expectations

The local convenience store makes personal pan pizzas. Currently, their process makes complete pizzas, fully cooked, for the customer. This process has a fixed cost of $20,000, and

What is the difference between the concepts of design quality and conformance design? Give examples to compare/contrast the two concepts.