Request for quote, finance, Other Engineering

Assignment Help:
I need the following corporate finance problems completed in an excel spreadsheet. How much would this cost?
1) An investment project requires a net investment of $100,000. The project is expected to generate annual net cash flows of $28,000 for the next 5 years. The firm''s cost of capital is 12%. Part 1 - Determine the payback period for the project. Part 2 – Determine the payback period accounting for the present value of future cash flow (ie. Present value calculations). Should the project be done? After considering present value is the 100,000 investment recovered in 3-4 years, 4-5 years or over 5 years?





2) What is the IRR for a project that has a net investment of $14,600 and a single net cash flow of $25,750 in 5 years?





3) Red Lake Mines, Inc. is considering adoption of a new project requiring a net investment of $10 million. The project is expected to generate 5 years of net cash inflows of $5 million per year. In the project''s sixth, and final, year it is expected to have a net cash outflow of $1 million. What is the project NPV, using a discount rate of 12%?




4) Zimmer, a manufacturer of modular rooms, plans to expand its operations in Landshut, Germany. The expansion will cost $14.5 million and is expected to generate annual net cash flows of €2.15 million for a period of 12 years and then the operation will be sold for €1 million (net of taxes). The cost of capital for the project is 14%. Using a spot exchange rate of $1.25/€ as the forecast FX rate for the euro for the term of the project, compute the NPV of this expansion project.






5) Dupree Funds is considering the fees charged by two banks. First America charges a flat rate of $0.11 per payment and First Western requires a deposit of $500,000 (that does not pay interest to Dupree), plus $.05 per payment. What is the number of payments per year where the costs of the two banks will be equal? Assume Dupree''s cost of funds is 9%.









6) What is the annual tax shield to a firm that has total assets of $80 million and a net worth of $55 million, if the average interest rate on debt is 8.5% and the marginal tax rate is 35%?







7) Jason is interested in finding the breakeven point for a new pump it plans to produce. The price of the pump is $250 and the variable cost ratio is 50% of the price. Jason calculated that the fixed costs will be about $400,000. What is the breakeven point of operations?













8) Crown Honda purchased one of its most popular motorcycle models for 965,000 yen. The FX rate for the yen was 142 yen per dollar at the time of purchase, but then rose to 171.8 yen by the time payment was made. What was the dealer’s gain or loss on the change in rates?









9) Seduak has estimated the costs of debt and equity capital for various proportions of debt in its capital structure.

% Debt After-tax cost of debt Cost of equity
0% - 13.0%
10 5.4% 13.3
20 5.4 13.8
30 5.8 14.4
40 6.3 15.2
50 7.0 16.0
60 8.2 17.0

Based on these estimates, determine Seduak’s optimal capital structure

Related Discussions:- Request for quote, finance

Burners - aircraft engine , BURNERS :  ATOMISER BURNERS This ...

BURNERS :  ATOMISER BURNERS This type of burner presents the fuel in a finely atomised spray by forcing the fuel to pass through a small orifice. The size of the orifi

Longitudinal trim, A trimmed flight condition is perhaps best thought of as...

A trimmed flight condition is perhaps best thought of as an equilibrium condition. The simplest trim condition is straight-and-level flight, in which the forces (weight, propulsive

Engineering Mechanics-Statics, http://www.cramster.com/answers-apr-12/mecha...

http://www.cramster.com/answers-apr-12/mechanical-engineering/engineering-mechanics-static_2386217.aspx?rec=0

Environmental engineering, compare conventional lagoon,aerated lagoon and a...

compare conventional lagoon,aerated lagoon and activated sludge process,including process flow diagrams and hydraulic retention timesquestion #Minimum 100 words accepted#

Time-flow diagram, One approach of an intersection with fixed time traffic ...

One approach of an intersection with fixed time traffic signals, vehicles arrive at 500 veh/h on the approach. The cycle time of the intersection is 80 seconds, and the effective g

Electronics, how to make an amplifier circuit ?

how to make an amplifier circuit ?

Engine torque, ENGINE TORQUE It is the force of rotating action about t...

ENGINE TORQUE It is the force of rotating action about the crankshaft axis at any given instant of time. It is given by,

Engine controls - aircraft engine, Engine controls: Engine controls are...

Engine controls: Engine controls are very similar to flying controls, and the same types of equipment are used, such as rods, bellcranks and cables. Most control systems use ei

Software engineering, what is differnce between need and requirement?

what is differnce between need and requirement?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd