Q. Explain Shear stiffness in elastomeric bearing? For elastomeric bearing shear stiffness is a significant parameter for design since it influences the force transfer between

Interface between base plates and footings Surface of footings is generally quite rough so that some levelling has to be carried out for base plates. Interface between base pl

Question While designing lateral resistance of piles , have to engineers only use earth pressure against pile caps simply? Answer In case of designing lateral loa

when a precast pile is single point lifting and when double point lifting- what are the moment coefficient of them?

Airport Management: Airlines (a)        Adequate space for each airline for ticketting, check-in and baggage handling, and (b)       Adequate space for airline staff.


Define the term - Clamp splice In a Clamp splice, bolts and nuts alongwith clamp plates are used. Tendons are held in-between the clamp plates and these clamp plates are tighte

Q. Show the Excessive movement joints in bridges? Movement joints are generally added to bridge structures to accommodate movements because of dimensional changes arising from

what is grillege foundation and where are use

Q. Earth work in high embankments? (a) Borrow pits must not be dug close to telegraph poles, electric poles, level crossings, bridges a culverts, or within 800 meters of the bo