PRODUCTION PLANNING & CONTROL, Mechanical Engineering

PRODUCTION PLANNING & CONTROL
Assignment 2



Kid style, International, makes furniture designed for children. Its most popular items are large and small toy boxes. Demand for toy boxes has over loaded its MPS, and the company does not know how it will meet demand.

1. Given the following BOM, MPS, and Inventory Master File, generate MRP
matrices for each item and identify orders that are past due.




Product Structure for Large and Small Boxes

Large toy box





Large housing Hardware Decals




Small toy box





Small housing Hardware Decals




Master Production Schedule

Item 1 2 3 4 5 6 7 8
Large toy box 30 60 30
Small toy box 25 45 60 30

Item Master File

Item On
Hand LT Lot Size
(multiples) Scheduled Receipt
Period Quantity Unit
Value $
Large toy box 30 2 50 - - 50.00


Small toy box 25 2 1 - - 30.00
Large housing 35 2 100 - - 15.00
Small housing 45 2 75 - - 10.00
Hardware 55 2 40 2 40 5.00
Decals 50 2 1 2 50 5.00

Kid style’s Scheduling Notes and Policies

1. Monthly sales forecast should be met within plus or minus 10%.
2. Delay of a customer’s order costs 10% of the value of the order per week.
3. Customer order may be delayed a maximum of two weeks.
4. It is possible to halve lead time, but the cost of producing or ordering the item increases by 50% (e.g. workers get paid time and a half for overtime)



Pegging Report

Requirements
Item Period Quantity Type Reference
Small toy box 1 25 MS-CO B070002
3 45 MS-CO B070002
4 30 MS-CO B064444
4 30 MS-FO Z842009
6 30 MS-FO
Large toy box 2 30 MS-CO A080100
4 30 MS-CO B064444
4 30 MS-FO Z900620
6 30 MS-FO
Posted Date: 10/4/2012 4:27:31 PM | Location : United States







Related Discussions:- PRODUCTION PLANNING & CONTROL, Assignment Help, Ask Question on PRODUCTION PLANNING & CONTROL, Get Answer, Expert's Help, PRODUCTION PLANNING & CONTROL Discussions

Write discussion on PRODUCTION PLANNING & CONTROL
Your posts are moderated
Related Questions

Scheduling and Sequencing: This unit begin with the basic concept and the role of scheduling in industry. Several job- sequencing rules to address the manufacturing process ar

Charpy impact tests, when required shall comply. Impact tests shall be conducted at the minimum design metal temperature or at a lower temperature and shall meet or exceed energ

Five jobs are performed first-on Machine-I and then on Machine-II. Time in hours taken by each job on each machine is given below :

Q. Explain about Hydrostatic Test? All paragraph must be met when the hydrostatic test is employed. UG-99(b), including footnote 32, shall be considered to be the standard hyd

Introduction to Computer: This covers the major hardware features of computer graphics systems such as video monitors, keyboard, hard copy devices, and other devices for graph

Hinged Support: Hinged (Pin) Support: At hinged end, beam cannot move in any direction support will not develop any resisting moment, but it can develop reaction in any of t

Brinel l Hardness Test: Insert the Ball of diameter D in ball holder of machine. Make specimen surface free from dust and dirt. Make contact between the surface and ball b

what is crippling load in column and strut

Aluminium Cast Alloys: Aluminium alloys the cast through any one of the given processes. Sand Casting is the easiest and most versatile process minute castings, complex ca