Production option and the ato process design, Operation Research

The plant is using the chase production option and the ATO process design. The BOM is illustrated below.

585_Untitled.png

 

Requirement

The factory works on a process layout but the order lot sizing is open for determination. Verify the optimal method for lot sizing.

Questions:

 

What is BOM?

 

What is 2 to 1?  1 to 1?

 

 

Posted Date: 3/22/2013 5:23:56 AM | Location : United States







Related Discussions:- Production option and the ato process design, Assignment Help, Ask Question on Production option and the ato process design, Get Answer, Expert's Help, Production option and the ato process design Discussions

Write discussion on Production option and the ato process design
Your posts are moderated
Related Questions
maximize z=3x1+2x2 subgect to the constraints x1+x2 x1-x2 x1,x2>_0



Non-Documentary Sources: On the other hand, non-documentary sources are institutional and human resources, both of which are important links in the information-transfer chain.

Z-Test Prof. Fisher has  given a method  of testing the significance of the correlation coefficient in small  samples. According  to this method the  coefficient of correlation

Six Operators are to be assigned to five jobs with the cost of assignment in Rs. given in the matrix below. Determine the optimal assignment. Which operator will have no assignment

Maxz=3x1-2x2 St x1 -x2>_0, 3x1-x2 _0

Discuss the methodology of operation research

Which model is described as a rule of thumb

if one no. is repeated 2-3 times in machine-1 and machine-2 what is to be prefer first