The plant is using the chase production option and the ATO process design. The BOM is illustrated below.

585_Untitled.png

 

Requirement

The factory works on a process layout but the order lot sizing is open for determination. Verify the optimal method for lot sizing.

Questions:

 

What is BOM?

 

What is 2 to 1?  1 to 1?

 

 

Posted Date: 3/22/2013 5:23:56 AM | Location : United States







Related Discussions:- Production option and the ato process design, Assignment Help, Ask Question on Production option and the ato process design, Get Answer, Expert's Help, Production option and the ato process design Discussions

Write discussion on Production option and the ato process design
Your posts are moderated
Related Questions
DECILES The nine points  on the scale of observations  ( or  values of the variable) which divide the total  frequency into ten  equal parts  are called deciles for the data

SOLVE THE FOLLOWING LP USING SIMPLE METHOD MAXIMIZE Z=3X1+2X2 SUBJECT TO CONSTRAINT X1+X2 X1-X2 X1,X2>=0

#A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper

This year Jan Rich, who is ranked number one in women''s singles in tennis, and Marie Wacker, who is ranked number three, will play 4 times. If Marie can beat Jan 3 times, she will

The following linear programming is written to plan the production of two products. And the company wants to maximize profits. x1 = number of product 1 produced in each batch

Determination of effectiveness Measures: Effectiveness measure is a measure of success of a model in representing a problem and providing a solution. It is the connecting link

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

write the scope of operation research

Consider the closed network of the following figure. The number at the arrows give the transition probabilities for a customer leaving the queue to route to a subsequent queue. Eve

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i