Production option and the ato process design, Operation Research

The plant is using the chase production option and the ATO process design. The BOM is illustrated below.

585_Untitled.png

 

Requirement

The factory works on a process layout but the order lot sizing is open for determination. Verify the optimal method for lot sizing.

Questions:

 

What is BOM?

 

What is 2 to 1?  1 to 1?

 

 

Posted Date: 3/22/2013 5:23:56 AM | Location : United States







Related Discussions:- Production option and the ato process design, Assignment Help, Ask Question on Production option and the ato process design, Get Answer, Expert's Help, Production option and the ato process design Discussions

Write discussion on Production option and the ato process design
Your posts are moderated
Related Questions
User Groups: The next step would be to identify more specifically the potential user groups. This may be done on the basis of interviews, questionnaires, study of organisation

undertake the proposed research investigation in accordance with the agreed specification and procedures

Assumption for  students Test a.The parent population from  which the samples is  drawn in normal. b.The sample observations  are random  i ,e the given  sample is  drawn

#Principles of OR

How do I set this problem up for Excel: A National Credit Union has $250,000 available to invest in a 12 month commitment. The money can be placed in Treasury notes yielding an 8%

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y pa

Do it  Everything  about  the presentation is  ready and so  are you. The only  things  left if to face the audience in a confident and positive  manner and leave a mark on

How to solve linear programming problems using simplex method introducing slack variable,surplus variable and artificial variable

Simple Graph The values of the two variables are plotted on a graph paper. We get two curves one for x variables and another for y  variables. These  two curves reveal the dir

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i