A paper mill produces two grades of paper viz., X and Y. Because of raw
material restrictions, it cannot produce more than 400 tons of grade X paper
and 300 tons of grade Y paper in a week. There are 160 production hours in a
week. It requires 0.20 and 0.40 hours to produce a ton of grade X and Y papers.
The mill earns a profit of Rs. 200 and Rs. 500 per ton of grade X and Y paper
respectively. Formulate this as a Linear Programming Problem.
Posted Date: 2/13/2013 11:40:11 AM | Location : USA







Related Discussions:- Problem, Assignment Help, Ask Question on Problem, Get Answer, Expert's Help, Problem Discussions

Write discussion on Problem
Your posts are moderated
Related Questions
You are required to analyse the case study, as indicated under these headings: 1. Identify FIVE persons, bodies, organisations or groups in the case study. 2. For EACH of the

Question: (a) (i) What do you understand by the term ‘queueing theory'? Give two real life examples to illustrate your answer. (ii) Outline the five components involved in


A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

A water chillier with a capacity of 30 TR cools 20 m 3 /hr. water entering at 12 o C what is the temp. of water leaving the chillier. A reversible engine has an ideal thermal ef

How to solve linear programming problems using simplex method introducing slack variable,surplus variable and artificial variable

Level of Significance In testing a given  hypothesis  the maximum  probability with which  we would  be willing  to take  risk is called  level of  significance of the  test.

- A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y pape

management wants to know how many supervisors should be hired, and what could be the optimum workload distribution to be applied, given a number of constraints