Precentile - measure of central tendency , Operation Research

PRECENTILE

The ninety  nine  points on the scale  of observation s( or values of the variable) which divide the total  frequency  into  hundred equal  parts  are called percentiles for the  data arranged in ascending or  descending order of magnitude..

When  data are in  ascending order the first  is called  first  percentile  and is  denoted by P1 the  second  point is called  second percentage and is denoted  by P2 and so  the last  point  is  called  ninety  ninth percentile and  is denoted by P99.

 

Posted Date: 3/4/2013 2:01:11 AM | Location : United States







Related Discussions:- Precentile - measure of central tendency , Assignment Help, Ask Question on Precentile - measure of central tendency , Get Answer, Expert's Help, Precentile - measure of central tendency Discussions

Write discussion on Precentile - measure of central tendency
Your posts are moderated
Related Questions
What Is operation Research

Case Study Methods: It is studying the phenomenon event situation or development through a thorough and detailed analysis or intensive study. The case may be an individual a gr

Institutional Characteristics:  An approach to an understanding of the fields of interest of individuals to be served and of the organisation as a whole could begin by acquiri

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

Minimization Example  A farmer is advised to utilize at least 900 kg of mineral A and 1200 kg of mineral B to increase the productivity of crops in his fields.

#questA paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y p

is model the essence of oprational research.

A DRUG MANUFACTURER produces 2 products X1 and X2.X1 needs 2 hours on machine A AND 2 HOURS ON MACHINE B.X2 needs 3 hours on machine A and 1 hour on machine B.If machine A can run

Six Operators are to be assigned to five jobs with the cost of assignment in Rs. given in the matrix below. Determine the optimal assignment. Which operator will have no assignment

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i