power system engineering, Electrical Engineering

A three-phase transposed line is composed of one ACSR conductor per phase with flat horizontal spacing of 11 meters as shown in Figure (a). The conductors have a diameter of 3.625 cm. The line is to be replaced by a three-conductor bundle of ACSR. Each conductor of bundle is having the same diameter as the single-conductor line. The new line will also have a flat horizontal configuration, but it is to be operated at a higher voltage and therefore the phase spacing is increased to 14 m as measured from the center of the bundles as shown in Figure (b). The spacing between the conductors in the bundle is 45 cm. Determine
(a) The percentage change in the inductance.
(b) The percentage change in the capacitance.
Posted Date: 10/6/2012 5:46:20 AM | Location : United States







Related Discussions:- power system engineering, Assignment Help, Ask Question on power system engineering, Get Answer, Expert's Help, power system engineering Discussions

Write discussion on power system engineering
Your posts are moderated
Related Questions
Q. Is a depreciation of the dollar/euro exchange rate correlated with a decrease in the dollar return on U.S. deposits? Answer: No, suppose that the Interest Parity is maintai


Explain the difference between a microprocessor and an embedded microcontroller

#how to draw bode plots for a transfer function

Q. Explain about Half Duplex Transmission? Half Duplex Transmission A half-duplex channel can receive andsend, though not at the same instance. It's like a one-lane bridge w

The circuit shown below is a prototype 4 th - order low-pass filter which is required to meet the specification given. However the specification is not met due to inadequate atten

Schottky  diodes The schottky diodes have very fast recovery time and  low forward drop.  The current  ratings of  these diodes  vary  from 1A to 300 a and  maximum  allowable

#question. . =calculate the calcium carbonate equivalent hardness of calcium sulphate of 5gms present in one litre

importance of dummy coils and equalizer connections

Q. Show the Methods of material handling? Methods of material handling during operations and maintenance activities shall be considered for all facilities to ensure that the fi