This assessment will test Learning Outcomes 3 and 4 as well as the component of Learning Outcome 1 as it refers to waste disposal for the Plumbing Technology. The student is expected to answer questions 1 and 2 to demonstrate his/her understanding of all the associated assessment criteria.

 You are a member of a design team in a consulting engineering company engaged by a developer. The developer requires preliminary designs for a complex in East Trinidad which aims at meeting the needs of the modern middle class family. The complex includes twelve (12) townhouses, a senior citizen retirement home and shopping centre with food court.

The townhouses are two (2) storey buildings, four (4) bedrooms, accommodate five (5) persons, master bathroom with bathtub, laundry and hot and cold water supply.

The senior citizen retirement home is central air condition two (2) storey building, provides accommodation for sixty (60) residents, fifteen (15) staff members, and a doctor's office with facilities to provide basic health care.

The shopping centre includes ten (10) stores and a food court with five (5) restaurant outlets.

Question 1

You are required to:

1. Produce a sketch plan showing the wastewater reticulation system for the complex.

2. Show how the foul water, rain water and surface water from the complex will be removed or reused on the complex.

3. Describe how the wastewater system for the complex will be tested and commissioned.

You are to ensure that all the requirements of the clients and buildings are met and that the designs comply with local regulatory standards for wastewater supply and solid and liquid waste disposal. You are to state all the assumptions made and provide a list of client and building requirements.

Question 2

You are required to:

a.  Describe what methods could be employed to dispose of the solid and liquid waste for the complex. 

b.  Utilise any latest technologies for recycling and recirculation of solid and liquid waste disposal on the complex.

c.  Provide simple sketch of pertinent/appropriate sections of the design depicting the system that will be utilized to achieve (a) and (b) above.

Posted Date: 2/21/2013 12:39:59 AM | Location : United States







Related Discussions:- Plumbing technology, Assignment Help, Ask Question on Plumbing technology, Get Answer, Expert's Help, Plumbing technology Discussions

Write discussion on Plumbing technology
Your posts are moderated
Related Questions
If you have water pressure and wish to handle it, do not cause flow in the line, which will decrease pressure because of friction. To keep pressure up, decrease friction by increas

Five 1m diameter, 2m high cylindrical drums filled with earth are placed upright and side-by-side in a straight line across a 5m wide creek to form a simple dam completely blocking

what is the procedure to design the beam and column?

How do you distinguish among clay and silt in the field? State the purpose of identification and categorization of soils. List any three significant engineering classification syst

A building was to be constructed on a clay stratum. Preliminary analysis showed a settlement of 60 mm in 6 years and an ultimate settlement of 250 mm. The average enhance of pressu

gradation of materials used in wet mix macadam

draw the shear force and bending moments of a beam

(i) A dry soil has a void ratio of 0.65 and its grain exact gravity is = 2.80. What is its unit weight? (ii) Water is added to the sample so that its degree of saturation is 60%

Question What is major disparity between fasteners , bolts and screws ? Answer Fastener is a broad term to explain something that is used as a restraint for holding