Peril database, Project Management

PERIL Database 

The Project Experience Risk Information Library (PERIL) is a database, which provides a basis for the analysis of high-tech project risk. 

A project can have known risk, which appears frequently and can be easily analysed and the unknown risk, which  are unique and difficult to analyse. PERIL provides a template which acts as a framework for risk identification. 

The data 

PERIL cannot be considered as comprehensive as it  contains  very less number of projects taken on by the project managers. It does not include all the problems encountered by the projects present in it. 

  •   PERIL collects data which are self-reported. 
  •   PERIL represents few minor risks in it. 
  •   The collected risk information is typical to the projects included in it. 

The PERIL represents risk impact in terms of time. It consist both long term and short term projects, however, most of projects have duration between six month and one year. The typical staffing for some very large programs was between 10 and 25 people. Below table represents the geographic and raw project numbers in the PERIL database.  

Table: Sources of PERIL Data   

581_peril data.png

Posted Date: 9/24/2012 9:15:19 AM | Location : United States







Related Discussions:- Peril database, Assignment Help, Ask Question on Peril database, Get Answer, Expert's Help, Peril database Discussions

Write discussion on Peril database
Your posts are moderated
Related Questions
Qualities by design tools that decrease total product development time utilize high powered software and the latest in desktop computers. The primary qualities by design to

The international organization for standardization ( ISO) is the specialized international agency for standardization and at present comprises the national bodies of 91 c

Failure Cost of failure may result from either internal failure or external failure. Internal failures are those that occur before the product is delivered, internal failure co

Limitations of Group Technology or Cellular Manufacturing Group Technology is a great concept. But all good concepts do have their own limitations and need proper care in their

Perform a status assessment of the second Elaboration iteration. DO NOT GENERALISE. Assess each activity separately against the outcomes specified for the activity. Generate a deta

Question 1 Differentiate between Commercial and Open Source ERPs software packages Question 2 For a successful MRP system three types of information are very essential. Descr

Verification is the process by which one can ensure that a model is performing as expected or intended. The process of verification is a challenging one for the project concerned a

Question: A brilliant UTM student at the end of his graduation is in presence of two opportunities and has to choose between them. One is a job offer with a salary of Rs15,000

Question: (a) (i) What do you meant by "a change of scope" in a project? (ii) Unplanned changes (for e.g, unplanned expenses) might occur during the implementation phase of

What are the necessary features of the Earned Value Management? Necessary features of EVM systems: a. A quantified project plan which identifies work or activities to be