Overhead bridge crane, Mechanical Engineering

Overhead Bridge Crane
Figure below shows a jib crane. In this type of crane the hook can move in a circular path. A jib crane is preferred where lifting of the jobs is required in few location only or where bridge crane cannot be erected. In a jib crane hoist unit may be mounted on an section jib which is in turn supported on a column.

Posted Date: 3/25/2013 3:52:19 AM | Location : United States







Related Discussions:- Overhead bridge crane, Assignment Help, Ask Question on Overhead bridge crane, Get Answer, Expert's Help, Overhead bridge crane Discussions

Write discussion on Overhead bridge crane
Your posts are moderated
Related Questions
Compare Rankine cycle with Carnot cycle: Sol.: Rankine cycle without superheat: 1 - A - 2 - 3 - 4 - 1. Rankine cycle with superheat : 1 - A - 2 - 2′ -3′ - 4 - 1.

Define the term linear non-uniform soil pressure. See that the eccentric load on a column as in demonstrated figure also produces a similar effect. The linear non-uniform soil


Pure Torsion: What do you mean by pure Torsion?                                                                                                       In general two typ


Q. Wha t do you mean by section modulus ( Z )? What is value of bending moment in the terms of section modulus? Sol.: Section modulus is ratio of M.I. about neutral ax

What factors should be considered when selecting a digital encoder (line codes)? Briefly mention five of those factors. Use sketches and additional text to describe the following e

Q. Use of High temperature material in Superheaters? Typically superheaters and reheaters provide service lives of approximately 15 years (i.e. half the expected service life o

Find out diameter of steel wire: Q: A load of 5 KN is to be raised with help of steel wire. Find out diameter of steel wire, if maximum stress does not to exceed 100 MNm 2

write a matlab program to generate shear force diagram