Overall performance indicator method, Electrical Engineering

Overall Performance Indicator Method

Overall Performance Indicator could be derived from a combination of few of the specific core indicators. The way this combination is commonly performed is by a weighted average of core indices, whereas the weights reflect the significance assigns to every aspect of the firm performance, for a utility the weights might be assigned as per regulatory requirement/directive. These Indicator(s) give a summary index and establish the relationship among functions of different departments. Therefore it helps to communicate associate performance of wide stakeholders and a bridge the gap among different functions.

From a wider perspective, it helps the outside world to gauge the associative performance of various companies. For a utility, say regulator, might use these indicators to assess the associative efficiency of service companies.

Posted Date: 2/6/2013 2:38:58 AM | Location : United States







Related Discussions:- Overall performance indicator method, Assignment Help, Ask Question on Overall performance indicator method, Get Answer, Expert's Help, Overall performance indicator method Discussions

Write discussion on Overall performance indicator method
Your posts are moderated
Related Questions
Two stations, located on mountain tops 40 km apart, communicate with each other using two identical paraboloidal antennas with pencil beam- width of 1°, aperture ef?ciency of 0.8,

Define some Huntington postulates - Boolean Algebra? Postulates 1. Commutative Law (a) A + B = B + A (b) A B = B A 2. Distributive Law (a) A (B + C) = A B + A

report on diode

How is bias compensation in transistor is done using thermistors and sensistor

Kirchoff's Current Law The total current entering a node in a circuit is equal to the total current leaving that node. A Node is a junction between two or more components.

Explain LOOP instructions in 8086 family with example and their effect on flag. LOOP: (Jump to given label until CX = 0) it is used to repeat a sequence of instructions for

Forward Voltage  Triggering If V a is increased the collector to emitter voltages of both  transistor are  also increased. Hence  the leakage current at J 2 increase. This

Q. What is Schokleys Equation. Find out a relation between Vgs and Ids? Schokleys Equation is used for defining the relation between the Gate source voltage and the Drain curre

Phantom or Fictitious Loading Method While the capacity of meters under test is extremely high, testing with actual load method would includes a considerable loss of power and

Components of PLC There are followings  three main  components of PLC : a.The power supply and rack. b.The central  processing  unit ( CPU) c.The input / output  (I/O