Objectives- computer algorithm for on-line scheduling , Mechanical Engineering

Objectives

After studying this section, you should be capable to understand:

  • Cell aspects of scheduling,
  • Conventional priority rules,
  • Newer approaches to on line scheduling, and
  • scheduling of automated guided vehicles for material handling systems.

 

Posted Date: 3/5/2013 7:16:13 AM | Location : United States







Related Discussions:- Objectives- computer algorithm for on-line scheduling , Assignment Help, Ask Question on Objectives- computer algorithm for on-line scheduling , Get Answer, Expert's Help, Objectives- computer algorithm for on-line scheduling Discussions

Write discussion on Objectives- computer algorithm for on-line scheduling
Your posts are moderated
Related Questions
Pneumatic system is a system that uses air to power something. For example, have you seen the tube systems at bank drive-up tellers? Air is used to drive the tubes back and forth f

Occupational Health Problems Various health problems have been found to be rooted in type of work, equipment and Workplace. It was eighteenth century while definite observati

Main Factors to be Considered when Selecting Material The main factors to be considered when selecting a material to meet some specific requirement are: Fitness of use,

Alloy Steels: Carbon steels in their commercial forms all times comprise specific amounts of other elements. A lot of of these elements enter the steel from the ores and it is

The de-oiled water from De-Oiling Unit enters the HLS vessel for softening. The primary function of HLS is to remove the Ca and Mg hardness and bring the total hardness to less tha

Q. External Pressure Design of unfired pressure vessels? Determine requirements for external pressure based on the expected operation of the vessel, and add a suitable operatin

Repair of surface defects in welds by chipping, grinding and gouging is permitted provided the thickness is not reduced below the minimum required. Removal of defects shall be ver

Schedule Evaluation Each continuations of a partial schedule that are produced in step 1 are ranked as per to their respective cost function. This cost function might be dissim

Give justification toward the development of rapid prototyping?

Stud Welding This is an arc welding process in which the arc is struck between a metal stud or similar part and the base metal. The arc heats the mating ends to a proper tempe