Moisture-density relationship, Civil Engineering

Moisture-Density Relationship:

Since various compactive efforts result in varying degrees of compaction, it is necessary to standardize the compactive effort. The most well-known is the Proctor test, prescribed by IS : 2720-Part VII. This consists of compacting the soil in three layers in a mould 100 cm3 volume, with a rammer 2.6 Kg dropped from a height of 31 cm, giving 25 blows on each layer. The Proctor density so derived is used for low volume roads such as Rural Roads. For high volume highways, a heavy compaction is prescribed. The test known as modified AASHTO compaction that (IS : 2720-Part VIII) uses a heavier rammer 4.5 Kg weight, dropped from a height of 45.7 cm, the soil being compacted in 5 layers, each layer receiving 25 blows.

For controlling the density achieved in the field, a core is cut and its volume measured by pouring sand (sand replacement method). Knowing the weight of the core removed and its volume, the density is calculated. It is customary to specify 95 per cent of the laboratory MDD (modified AASHTO compaction) for embankment and 97 per cent for the subgrade for highways. For low volume Rural Roads, it is customary to specify 97 per cent of the laboratory MDD (Proctor's test) for embankment and 100 per cent for the subgrade.

Posted Date: 1/22/2013 2:49:38 AM | Location : United States







Related Discussions:- Moisture-density relationship, Assignment Help, Ask Question on Moisture-density relationship, Get Answer, Expert's Help, Moisture-density relationship Discussions

Write discussion on Moisture-density relationship
Your posts are moderated
Related Questions
Explain couple. What are the characteristics of a couple?

Define the Types of Transmission in Ultrasonic System? Types of Transmission Three Types of Transmission through the testing element is possible, namely: - Direct transmi

Physical Tests on Cement (a) Soundness Test: by sieve analysis, it is conducted. 100 gms of cement is taken and sieved throughout IS sieve No. 9 for fifteen minutes. Residue on

The 6 monthly payment application for the construction of a $70,000,000 University dormitory is analyzed and the summary accounting show: the budgeted cost of work performed is $14

shrinkage factor in plans

what is the difference between bitumin and asphalt

State the size of a square footing at the ground level to transmit a load of 900 kN in sand weighing 18 kN/m 3 and having an angle of shearing resistance of 36° (N  = 46, Nq = 43)

Edge piles take up more loads than central piles in rigid cap Because of the effect of interaction of individual piles, central piles tend to settle more than the edge piles w

Question For column reinforcements, why is helical reinforcement sometimes designed instead of regular links with reasons? Answer The utilization of links for column designi

Explain the Variable Conditions of River Flow and Health State? The variable conditions of river flow and health state of structure demands constant supervision.  Although scou