Metrics followed in project management, DOT NET Programming

What are the metrics followed in project management?

The most metric sets deal with a variation of these attributes and are chosen to help the project managers gain insight into their product (software quality, size,  rework), process (software quality, rework ) &  project (schedule, effort).

But below is a broader classification:-

1)      Project Management Metrics:

(i) Milestone metrics

  • number of milestones
  • number of proved requirements per milestone
  • controlling level metrics

(ii) Risk metrics

o   The Probability of resources availability

o   The Probability of the requirements validity

o   The risk indicators (long schedules, inadequate cost estimating, unanticipated acceptance criteria, excessive paperwork, error-prone modules, cost overruns, canceled projects, excessive schedule pressure, low quality, creeping user requirements, excessive time to market, unused or unusable software, hidden errors)

o   The application risk metrics

(iii) Workflow metrics

  • walkthrough metrics
  • traceability metrics
  • variance metrics

(iv) Controlling metrics

  • Size of control elements
  • Structure of control elements
  • Documentation level
  • Tool application level

(v) Management database metrics

  • data quality metrics
  • management data complexity
  • data handling level (performance metrics)
  • visualization level
  • safety and security metrics

2)      Quality Management Metrics:

(i)Customer satisfaction metrics

  • characteristics size metrics
  • characteristics structure metrics
  • empirical evaluation metrics
  • data presentation metrics

(ii) Review metrics

  • number of reviews in the process
  • review level metrics
  • review dependence metrics
  • review structure metrics
  • review resources metrics

(iii) Productivity metrics

  • actual vs. planned metrics
  • performance metrics
  • productivity vs. quality metrics

(iv) Efficiency metrics

  • time behavior metrics
  • resources behavior metrics
  • actual vs. Planned metrics

(v) quality assurance metrics

  • quality evaluation metrics
  • error prevention metrics
  • measurement level
  • data analysis metrics

3)      Configuration Management Metrics:

(i) change control metrics

  • size of change
  • dependencies of changes
  • change interval metrics
  • revisions metrics

(ii)  Version control metrics

  • number of versions
  • number of versions per customer
  • version differences metrics
  • releases metrics (version architecture)
  • data handling level
Posted Date: 9/25/2012 1:32:05 AM | Location : United States







Related Discussions:- Metrics followed in project management, Assignment Help, Ask Question on Metrics followed in project management, Get Answer, Expert's Help, Metrics followed in project management Discussions

Write discussion on Metrics followed in project management
Your posts are moderated
Related Questions
Investment Equation - C# Program I didn't know the exact code for computing Investment Equation. Can anybody suggest me the correct way for my problem?

Want a asp.net developer with SQL server and c# Project Description: I have a project that needs some changes to it. The project is 95% complete. It is designed on asp.net, p

Develop a Windows Backup Application Application Goal The goal is to prepare an easy to use application that provides the user peace of mind that all of their firewalls are b

im retrieving the path of image from the database i want to get the image in that path to be displayed in my datagridviewvolumn

What are the features of ADO.Net ?  ADO.NET features: 1. Disconnected Data Architecture 2. Data cached in Datasets 3. Data transfer in XML format 4. Interaction wit

What are basic methods of Data adapter? The three most commonly used methods of Dataadapter are as follows:- 1)Fill :- It Executes the SelectCommand to fill the DataSet ob

What are the modes of storing ASP.NET session? 1) InProc: - In InProc mode Session state is stored in the memory space of the Aspnet_wp.exe process. That is the default setti

MAT LAB programming Project Description: i have simulation and i need to simulate the equation in ,and test the all simulation it working with your work program other code sh

What is Thread.Sleep() The Thread's execution can be paused by calling Thread.Sleep method. This Thread.Sleep() method takes an integer value which  determines how long the thr

What is UDDI? The Full form of the UDDI is Universal Description, Discovery and Integration. The directory that can be used to publish and discover public Web Services. If you