Merits of continuous or flow production, Operation Management

Merits of Continuous or Flow Production

1.The direct labor content will be reduced since the comprehensive pre planning which is necessary will often produce economies in time.

2.Assuming the product task is initially designed correctly the reproducibility and hence the accuracy and precision are high .

3.Since inspection is inline deviations from standard are rapidly picked up.

4. Since there is no rest period between operations work in progress is at a minimum.

5. Again since there is no waiting period the provision of work in progress stores is unnecessary, and the total storage space required is significantly reduced.

6.Handling is reduced.

7. Control (including operations budgetary quality and supervisory control) is simplified the flow line being virtually self controlling .

8. Any weakness in materials or methods is immediately highlighted.

9. Materials requirements can be planned more accurately.

10. Investment in materials and resources used for a task can be more readily translated into income from sales.

Posted Date: 1/22/2013 8:08:41 AM | Location : United States







Related Discussions:- Merits of continuous or flow production, Assignment Help, Ask Question on Merits of continuous or flow production, Get Answer, Expert's Help, Merits of continuous or flow production Discussions

Write discussion on Merits of continuous or flow production
Your posts are moderated
Related Questions

Carrington inc is an international company engaged in the production and distribution of pharmaceutical is the petterson operations successful? To the degree that it can be judged

What is framing and how frames work in negotiation. Describe an example

Recommend the most effective approach to formulating a WBS for this project.

Marketers traditionally classify products on the basis of characteristics: durability, tangibility, and use (consumer or industrial).  for each product type by way of real-life exa

Explain preparation and analysis of balance sheet. Preparation and Analysis of Balance Sheet: Balance Sheet is one of the significant financial statements of a company provid

Analyze the diversity practices of your organization to determine if it is engaged in surface-level or deep-level diversity. Provide specific examples to support your response.

Which section of the project charter signed by sponsor, project manager and core team members typically describes decision authority and the expected commitment for each of these k

How feedback, Goals Competence, and motive has have either promoted or stunted performance in your own experiences at work.

1. What are the three requirements which must simultaneously be met when designing jobs?   Answer: Technical, economic and behavioural feasibility.