Measurement of river water levels, Mechanical Engineering

Assignment Help:

Q. Measurement of river water levels?

In designing bridges and other engineering structures on rivers, maximum discharge and highest flood level form essential data for design purposes. If the structure is meant for harnessing river water supplies, discharge and water level observations may be required to be made more often and in certain cases even daily. Various methods used in observation of water levels and measurement of discharge are described below, based primarily on the Indian Standards cited under reference. However , for making "short term" and "long term" measurement of discharge in accordance with Khosla Committee's recommendations, proposed Manual by R.D.S.O. for "Estimation of Design Discharge" may be referred. For methods of gauging, measuring rainfall and taking discharges on bridges nominated by R.D.S.O., instructions issued by R. D. S. O. may be followed.


Related Discussions:- Measurement of river water levels

Concept and application of limiting friction, Concept and application of li...

Concept and application of limiting friction: Sol.: The maximum value of frictional force that comes into play, when the body just begins to slide over the surface of the ot

Slidercrank, connecting rod AB of length L support a variable compressiv fo...

connecting rod AB of length L support a variable compressiv force F .Drive an expression for the moment of F about the crank axis O in the term of F L r and angle

Determining the largest eigenvalue, The Power Method is a classic numerical...

The Power Method is a classic numerical algorithm for determining the largest eigenvalue and eigenvector associated with a matrix A. Write a matlab function that returns the larges

Klein construction, how to find acceleration by Klein construction

how to find acceleration by Klein construction

What are the types of material used for making spanners?, (a) What are the ...

(a) What are the types of material used for making spanners? What are the uses of spanners? (b) Write down the uses of following tools and make neat sketches of the same : (i

Electron beam welding process-equipment used, EQUIPMENT USED IN EBW The...

EQUIPMENT USED IN EBW The electron beam equipment can be broadly divided in to the following sub systems. Electron Gun and Beam Guidance System The heart of the electron be

Three particle system, Three Particle System Suppose we have two partic...

Three Particle System Suppose we have two particles of masses  m 1  and  m 2   already fixed in space at distance  r 12  from each other. Let us bring in a third particle of

Inspection and testing of vessels, Q. Inspection and testing of vessels? ...

Q. Inspection and testing of vessels? The Vendor shall be responsible for all inspection and testing. WorleyParsons reserves the right to inspect vessels or parts of vessels at

Newton law of motion - second law, Newton law of motion: Secon d Law...

Newton law of motion: Secon d Law The rate of change of momentum is proportional to external force applied on the body and take place, in the same direction in which the

Calculate the component of this vector, (a) Describe a vector and scalar ? ...

(a) Describe a vector and scalar ? (b) What is meant by line of action of vector ? (c) What are displacement vectors and position vector ? (d) Calculate the component of t

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd