Maximize systematic variance, Management Theories

Maximize Systematic Variance:

The systematic variance is the variance or the difference caused in the dependent variable by the experimental variable. By maximizing the systematic variance means to magnify or makes evident the effect of the experimental variable on the dependent variable. The concept of variance and its control can be explained further on the basis of an example. Suppose a professor of sociology or an university administrator wants to improve the students performance in the class. For this he has to find a better method of imparting education. He makes the hypothesis that student reading habit is increased or their class performance is improved by the lecture method. In this example the experimental variable will be participation methods teaching the effect of which the professor or the administrator desires to measure as compared to the effect of lecture methods of teaching. Students performance is the dependent variable. In another study students reading habit can be taken as the dependent variable the experimental variable being the same.

Posted Date: 2/12/2013 5:43:01 AM | Location : United States







Related Discussions:- Maximize systematic variance, Assignment Help, Ask Question on Maximize systematic variance, Get Answer, Expert's Help, Maximize systematic variance Discussions

Write discussion on Maximize systematic variance
Your posts are moderated
Related Questions
Book Review Assignment   The Semester Project for MGMT 609 addresses the subject of Innovation and Entrepreneurship. The goal of the semester project is to get each student th

how to ethically aplly human resource systems and designs

Produce a Power point presentation on "graphing in management styles"

what is HRM

Latin Squares Design: This design suggests that test will form a square because there will be as many test units as treatments. This design is used to control important extra

It is about Outsourcing in general not for specific company. Who are the stakeholders involved and what is the relationship between the stakeholders? (Don’t just provide a list – e



define Phylum, its general characters and classifications.

what is the algorith to sequence jobs such that minimum time is taken for more than 2 machines