Mass and partial energy balance, Chemical Engineering

Mass and Partial Energy Balance

The process flow diagram attached shows a very simplified approach to the production of Potash from Sylvinite ore. Conduct a mass balance and a partial energy balance across this process using the data constraints and stream information outlined below. A molar balance is not required. Provide a concise report outlining your methodology, assumptions made and your mass balance table/spreadsheet. The report should be no more than 10 A4 pages including tabular output and handed in on Tuesday 9th October, 13:00 in ChE 124, as well as through webct.

An energy balance across the two dryers, the hot leach and the crystalliser is required. Discuss how heat integration might be applied. Brine is used to facilitate the separation of KCl from NaCl.

Brine is saturated sodium chloride solution. At ambient temperature it will dissolve neither KCl nor NaCl. At 90°C it will form a solution with the mass composition: 0.6% NaCl, 20%KCl, 79.4% brine. For the purpose of the mass balance treat the brine as a constant composition liquid. For the energy balance across the two fluidised bed dryers, treat it as H2O, comment on the validity of this assumption.

Note that the percentage separations given in the table below are nominal and may be adjusted within reason to help achieve the product specification and yields.

Posted Date: 2/15/2013 7:24:43 AM | Location : United States







Related Discussions:- Mass and partial energy balance, Assignment Help, Ask Question on Mass and partial energy balance, Get Answer, Expert's Help, Mass and partial energy balance Discussions

Write discussion on Mass and partial energy balance
Your posts are moderated
Related Questions
For the binary system 2, 4-dimethylpentane (1) + benzene (2) the excess Gibbs energy of the liquid phase is given by: G E /(x 1 x 2 ) = (A 12 x 1 + A 21 x 2 ) a. Calculate t


the inlet diameter of venturimeter 25mm and diameter of throat is 15mm.The coefficient of discharge for venturimeter is Cv=0.98.The height is found to be 5ml density of water is 10

construction and working of calomel and Ag-AgCl electodes

bernaulli''s theorm related numericals

Properties of filament and contact materials. The Filament materials must have low resistance temperature co-efficient, high melting point, high mechanical strength, ductility

Consider a heat-exchanger control loop with no dead time.  It is controlled by a PD controller.  The rate time is 0.25 min.  A real PD controller is used with filtering where a = 0

Check in and checkout procedure a. Location of Key: Enquire from the technicians as to who opens the laboratory. Does the lab staff have to take the keys from the office or

chemistry separate the mixture of sand and naphthalene by sublimation

Q1 What is wrong with each of the following attempts to write an electron configuration? Justify your answer with suitable explanation. (a) 1s22s3 (b) 1s22s22p23s2 (c) 1s22s23s2 (d