Q. Maintenance of steel bearings?
Cleaning and greasing of bearings is one of the important maintenance works to avoid premature failure of bearings and reduce recurring heavy repair cost of bed block and masonary below bed block. Steel bearing strip resting on steel base plate has a tendency to stick together on account of corrosion, and cease the movement of bearings. This is called as Frozen Bearing. Sliding bearings of plate girders are generally designed keeping both ends free. When bearings are frozen, a large amount of longitudinal force is transferred to the substructure for which the substructure may not have been designed. Upon introduction of RBG, MBG and HM loadings on the Indian Railway, longitudinal forces have increased considerably whereas the old substructures had been designed without considering such large longitudinal forces.
Sometimes, even repairs will not hold good if cause of frozen bearings is not eliminated by greasing. It has been laid down that the steel bearings of all girder bridges should be greased once in 3 years to ensure proper movement of bearing plates. This should be done once every two years when track consisting of LWR is continued over bridge span.
condition for no tension numerical problem
A square pile group of 9 piles passes by a recently filled up material of 4.5 m depth. The diameter of the pile is 30 cm and pile spacing is 90 cm centre to centre. If the unconfin
Water Absorption Test: In this test cube specimen weighing approximate 50 grams are prepared and the test is carried out in the steps following: 1. Note down the weigh
The transmission main from the well field to the community is 2500 ft, the velocity of flow at peak pumping capacity is 3.5 fps, water temperature is 10oC, and pH is 7.5. If free c
Question While pipe jacking or microtunneling , it is usually accepted that cover depths of jacking pipes cannot be also shallow as in less than 2D where D is the diameter o
Perimeter of a hexagonal pyramid
I retained the soil in my yard by brick with 3 levels to avoid sliding the soil to the street. the appeared part of the bricks from each level is 3 feet and less.The hidden part o
linear methods of surveying
terms of least cost method
calculating quantity of excavation, formwork, concrete
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd