Maintenance of Drainage:

Maintenance of drainage will ensure that the run-off is taken away from the runway efficiently. The side ditches and buried pipes should be cleaned regularly such that they are not clogged.

Maintenance of Markings

Repainting of markings which are worn out should be done periodically.

Maintenance of Shoulders

Shoulders should be graded periodically to ensure that they have the desired outward slope. Any shoulder drop-off at the runway/taxiway edges should be made good. All grass and shrubs should be cut and trimmed.

Posted Date: 1/23/2013 1:46:29 AM | Location : United States







Related Discussions:- Maintenance of drainage and shoulders, Assignment Help, Ask Question on Maintenance of drainage and shoulders, Get Answer, Expert's Help, Maintenance of drainage and shoulders Discussions

Write discussion on Maintenance of drainage and shoulders
Your posts are moderated
Related Questions
Q. Process of Lubrication of Girder Bearing? Oiling and greasing of bearings is done to ensure that the bearings are well lubricated and working freely to permit expansion and

Bituminous Concrete: Bituminous Concrete (BC) is a hot-mix superior type of bituminous surfacing, having a low voids (3-5 per cent), good durability high imperviousness and g

fabrication methods of ironmongery

The free float is equal to: a. Latest allowable event occurrence time + Early finish time b. Earliest event occurrence time + early finish time c. Latest allowable event o

Planning of Water Transport Facilities: Definition of Terms In water transport system, a number of terms are used. It is necessary for a civil engineer to know the pr

Mad/Sir What would be the Horizontal and vertical component from this acting force see diagram

what are the names of differemt types of doors

looking for someone good at structure analysis and design courswork

Extreme fiber stresses at the mid span section of  the beam A pre-stressed concrete beam, of  cross section 300 mm x 500 mm and 8 m span, is pre-stressed with a parabolic tend

what will happen if the water curing is in of and on