Maintenance of bridges - culverts and shoulders, Mechanical Engineering

Maintenance of Bridges and Culverts:

Careful inspection of bridges and culverts at periodic intervals can detect cracks, foundation settlement, scour, malfunction of bearings, silting and choking of waterway. Steel bridges require to be repainted at regular intervals. Broken parapets and railings need to be repaired. The growth of shrubs and vegetation blocking the passage of water should be cleared.

Maintenance of Traffic Control Devices

Traffic signs need to be painted at regular intervals. Broken posts should be replaced. The road markings need to be repainted if they have worn out or if the surface has been renewed.

Maintenance of Shoulders

Earthen shoulders at the sides of a pavement should be graded frequently so as to ensure that they are not above the pavement level and blocking the flow of surface run-off. Any growth of vegetation hindering the free flow of surface water should similarly be cut.

Posted Date: 1/22/2013 5:39:10 AM | Location : United States







Related Discussions:- Maintenance of bridges - culverts and shoulders, Assignment Help, Ask Question on Maintenance of bridges - culverts and shoulders, Get Answer, Expert's Help, Maintenance of bridges - culverts and shoulders Discussions

Write discussion on Maintenance of bridges - culverts and shoulders
Your posts are moderated
Related Questions
I have a bevel gear and shaft and I want to know the maximum load that can be applied on it. also I have no information about it, what kind of information is needed for this calcul

what is surging in turbo machines subject

Q. Burner Management - Discrete Controls for steam generators? The burner management system shall control the generator operation during pre-purge, light off, normal operation,


(a) Illustrate the concept of absolute thermodynamic temperature scale on the basis of second law. (b) In a Steady flow apparatus , 13.5 KJ of work is done by each kg of fluid.

An open-loop control system has the following state-space model: (a)  Determine the characteristic equation for the open-loop control system. (b)  Determine the characte

Let B be the number of bicycles formed  from F bicycle frames and T tires. Each bicycle require exactly two tires and one frame. a. Sketch the isoquants for bicycle production.

Q. Explain about Active Fire Protection? Active Fire Protection - A fire fighting system that is normally dormant and is activated automatically upon detection of a fire hazard

Deferentiate between hot working and cold working processes

Explain the study of readial Drilling machine with spindle The objective of this study is to study of readial Drilling machine with spindle. As in Radial Drilling machine th