Maintenance of bridges - culverts and shoulders, Mechanical Engineering

Maintenance of Bridges and Culverts:

Careful inspection of bridges and culverts at periodic intervals can detect cracks, foundation settlement, scour, malfunction of bearings, silting and choking of waterway. Steel bridges require to be repainted at regular intervals. Broken parapets and railings need to be repaired. The growth of shrubs and vegetation blocking the passage of water should be cleared.

Maintenance of Traffic Control Devices

Traffic signs need to be painted at regular intervals. Broken posts should be replaced. The road markings need to be repainted if they have worn out or if the surface has been renewed.

Maintenance of Shoulders

Earthen shoulders at the sides of a pavement should be graded frequently so as to ensure that they are not above the pavement level and blocking the flow of surface run-off. Any growth of vegetation hindering the free flow of surface water should similarly be cut.

Posted Date: 1/22/2013 5:39:10 AM | Location : United States







Related Discussions:- Maintenance of bridges - culverts and shoulders, Assignment Help, Ask Question on Maintenance of bridges - culverts and shoulders, Get Answer, Expert's Help, Maintenance of bridges - culverts and shoulders Discussions

Write discussion on Maintenance of bridges - culverts and shoulders
Your posts are moderated
Related Questions

Calculate the support reactions of beam: Q: Bending moment diagram (BMD) of the simple supported beam can be given as shown in figure given below. Calculate the support reac

Pliers: Pliers are used just for gripping or wire cutting and should never be used as substitute for spanners. The following types of plier are used : (a) Side cutting pliers


what is function of orifice

What are wall footings? Explain in short. Generally wall footings are required to support direct concentric loads. However, an exception is the wall footings for retaining wall

what is hartnell governor

Fixed Support: At such support beam end is not free to translate or rotate at the fixed end there are three reaction horizontal reaction ( R H ), a vertical reaction ( R V ), an


Rockwel l Hardness Test: The specimen is subjected to a major load for about 15 seconds after the initial load. ASTM says 13 scales for testing of wide range of materials. Th