Main problems related with prestressed concrete piles, Civil Engineering

Assignment Help:

Question

What are main problems related with prestressed concrete piles?


Answer

Origin of Daido piles comes from Japan where these prestressed actual piles are used as substitute plies. Holes are preformed in position and Daido piles are located inside these preformed holes with subsequent grouting of void gap between piles and neighbouring ground. Though, in Hong Kong Daido piles are constructed by driving into ground by hammers instead of originally designed replacement means. A fitting means of Daido piles is changed, construction troubles like twisting of pile tip shoes, crushing of concrete at pile tip and so on.

 


Related Discussions:- Main problems related with prestressed concrete piles

Roads in hilly areas, Roads in Hilly Areas: (a)        The alignment s...

Roads in Hilly Areas: (a)        The alignment selected should attain the changes in elevation by adopting the ruling gradient to the maximum length. Limiting and exceptional

Friction dampers, what is friction damper and there types?

what is friction damper and there types?

Describe the consolidation settlement, Q. Describe the Consolidation Settle...

Q. Describe the Consolidation Settlement? The resulting settlements which are time-dependent and are termed consolidation settlements. After the consolidation settlements take

Acetylene gas cylinder for gas welding, Q. Acetylene gas cylinder for gas w...

Q. Acetylene gas cylinder for gas welding to be erected in upright position Acetylene gas is normally used for gas welding due to its simplicity in production and transportati

Explain the angle of wall friction, A retaining wall 4.5 m high with vertic...

A retaining wall 4.5 m high with vertical back supports a backfill with horizontal surface. The unit weight of the fill is 18 kN/m 3 and the angle of internal friction is 36°. The

Define coefficient of consolidation, Define and distinguish among coefficie...

Define and distinguish among coefficient of volume compressibility and coefficient of consolidation. Explain clearly one method of computing coefficient of consolidation, given

Equipments required for under water inspection of bridge, Define Equipments...

Define Equipments and tools required for under water Inspection of Bridge? Since the underwater inspection of stone masonry substructures involve only a cursory inspection of t

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd