Long-term plans for technical loss reduction, Electrical Engineering

Long-Term Plans for Technical Loss Reduction

Long-term measures for technical loss reduction include all measures that require to be taken for the improvement of quality and reliability of power supply and reduction of AT&C losses in the area. These involved upgrading, strengthening and improvement of the Sub-Transmission and Distribution system in a circle to meet the future load demand for the further 5 years.

The present traditional reactive and ad-hoc approach to network development should be replaced through an approach based on technical and reliability requirements, economic considerations of costs of energy loss and expansion of system to meet the growth of prospective demand along with least cost.

Long-term plans based on system studies for phased strengthening and improvement of the distribution systems along with related transmission system have to be prepared and executed.

Posted Date: 2/6/2013 6:22:06 AM | Location : United States







Related Discussions:- Long-term plans for technical loss reduction, Assignment Help, Ask Question on Long-term plans for technical loss reduction, Get Answer, Expert's Help, Long-term plans for technical loss reduction Discussions

Write discussion on Long-term plans for technical loss reduction
Your posts are moderated
Related Questions
matlab code for handwritten digital

Hexadecimal  to Binary Conversion Conversion from  hexadecimal  to binary  is the  reverse  of this  process. Express each  hexadecimal  digit  in four bit  binary  equivalent

The creation of a magnetic field in a ring may need to be accessed by means of an air gap. This is typically used to apply the magnetic field to a current carrying conductor to pro

Q. What is Segment displays? Seven-segment displays are the most commonly used numeric display devices, while 10- and 16-segment (starburst) display devices are also available.

Write a short note on RS-232-C. The RS-232 standard is a collection of connection standards among different pieces of equipment. The EIA RS-232 serial communication standard is

Power Control A chopper converts  fixed  de input voltage to a controllable dc output voltage. It is  the single  stage dc to dc conversion device. It is a high  speed  on/ of

Covert Analog Signal into Digital Signal A strain gauge is used in Wheatstone Bridge configuration. The output from the Wheatstone Bridge varies from zero to a maximum strain

Certification of Energy Managers Certification of Energy Managers and Accreditation of Energy Auditing Firms One of the important provisions in the Act is to create a cad

1. (a) Consider a sinusoidal signal m(t) = A cos(2 Π f m t) applied to a delta modulator with step size . Determine the range of the step size so that slope overload will be avoide

Prepare a User Requirement Specification for the monitor and alarm system. User Requirements Specification should be written in a clear and unambiguous manner to state: • The