Linear problen, Mechanical Engineering

A paper mill produces two grades of paper viz. , X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper in a week. There are 160 production hours in a week. It requires 0.20 and 0.40 hours to produce a ton of grade X and Y papers. The mill earns a profit of Rs. 200 and Rs. 500 per ton of grade X and Y paper respectively. Formulate this as a Linear Programming Problem.
Posted Date: 2/11/2013 1:35:14 AM | Location : USA







Related Discussions:- Linear problen, Assignment Help, Ask Question on Linear problen, Get Answer, Expert's Help, Linear problen Discussions

Write discussion on Linear problen
Your posts are moderated
Related Questions
Q. Heat Exchangers - air-conditioning guidelines? Location, size and capacity clearly indicated. Control valves indicated. Space for tube removal, keep space clear of pipes, va

Explain construction and working process of newton''s ring

What is load? Sol. : A load can be defined as the combined effect of external forces acting on the body. The load is applied on body whereas stress is induced in material of

Q. Show Piping Material Specifications? Piping Material Specifications include the development and / or review of material specifications, and the review of data sheets, materi

Open coiled helical spring: In an open coiled helical spring along with α = 38 o , if the inclination of the coil is ignored, determine the percentage by which the axial exten

kinetic Inversion In a mechanism, in a kinematic chain one of the links is fixed. One can get different mechanisms by fixing in different links in a kinematic chain. This techn

The following form basis of evaluation : The unit has obtained all necessary clearances whether statutory or administrative, e.g. drug license under drug control order, NOC

Position of centre of gravity of the frustrum of a cone: situate the position of C. G. of the frustrum of a cone with height H = 12 cm and with  diameter 8 cm and 12 cm at top

Derive the shape functions N1...N10 for a 10 node triangular element in terms of area coordinates L 1 , L 2 , L 3 .  Nodes are equally spaced on the edges and node 10 is at the cen

Q. Module Site Installation Preparation? The following tasks shall be accomplished at the Facility site prior to setting the modules on the piles: After module support piles