Line Balancing
Line Balancing and Work Cell Balancing is an effective tool to increase the output of the Assembly line and Work Cell line to reduce manpower and cost. Assembly Line Balancing is nothing but the Simple Line Balancing is the calculation of assigning works to workstation alongside an Assembly Line and that operation will be optima in sense. Henry Ford who introduced the Assembly Line Balancing and in early times it was simple line balancing (LB) which has optimized the industrial importance, the effective difference between the optimal and sub-optimal operation can afford savings which will be million dollars every year.
Line Balancing: it is a Classical Operation Research (OR) which optimizes the problem, and it has been handled by OR for many decades. Most of the algorithms have been proposed to this problem and it contempt the usual importance of the issue and the OR use to handle this. It’s commercial software which is available to optimize the industry and their lines.
Assembly Line Balancing is dependent on 3 models and it is described that these 3 kinds of models is related to Assembly Line Balancing and they are Single-Model Assembly lines, mixed models, and multi-model Assembly lines.
Singe-Model Assembly Line: in early times assembly lines were used in high level production of a single product. But now the products will attract customers without any difference and allows the profitable utilization of Assembly Lines. An advanced technology of production which enables the automated setup of operations and it is negotiated time and money. Once the product is assembled in the same line and it won’t variant the setup or significant setup and it’s time that is used, this assembly system is called as Single Model Line.
Mixed Model Assembly Line: in this model the setup time between the models would be decreased sufficiently and enough to be ignored. So this internal mixed model determines the assembled on the same line. And the type of assembly line in which workers work in different models of a product in the same assembly line is called Mixed Assembly Line.
Multi-Model Assembly Line: in this model the uniformity of the assembled products and the production system is not that much sufficient to accept the enabling of the product and the production levels. To reduce the time and money this assembly is arranged in batches, and this allows the short term lot-sizing issues which made in groups of the models to batches and the result will be on the assembly levels.
Posted by Diana | Posted Date: 2/12/2013 7:27:44 AM


Related Discussions:- line balancing, Assignment Help, Ask Question on line balancing, Get Answer, Expert's Help, line balancing Discussions

Write discussion on line balancing
Your posts are moderated
Related Questions
Identify five key economic variables that could represent major opportunities or threats to a bank in your town or city. Identify which that you believe to be most important, and d

Due to changes in regulatory requirements, the transactions costs associated with selling corporate securities increased by $1 per share. This change will Answer a. cause the co

What are companies that have low customer contact and are capital intensive; yet provide a service, called?

What is Espirit de Corps? The principle of management which emphasizes the requirement for teamwork among employees is termed as Espirit de Corps.

If a wireless signal collides with an object whose dimensions are much larger than the signal's wavelength, what is the signal most likely to do? a. reflect b. refract c.

Existing salary for managers is 45,000 euros (58,567 us dollars) plus bonuses. Average salary for managers in range is 60,000 euros (78,090), no bonuses. Recommendations must inclu

Oregon Productivity Matrix - Performance Measures The Oregon productivity matrix (OPM) was developed in Oregon State University in 1986 and measures accomplishments against go

Tasks, Predecessors and Times - Process Design The first step in the procedure is to draw a precedence diagram, shown here, the task labels and times entered in the nodes

The broad goal of _____ is to identify and define both marketing problems and opportunities and to generate and improve marketing actions. advertising sales promotion publ

Which of the following actions would expand the feasible region of an LP model? A.Loosening the constraints. B.Tightening the constraints. C.Multiplying each constraint by