Lean enterprise, Other Engineering

a department manufactures a produt using a kanban system. data is demand/hr= 30, container size= 5, unit processing time= 1.25 min. find the minimum number of kanban assuming replenishment lead time is 3 hours
Posted Date: 2/13/2013 8:46:03 PM | Location : United States

Related Discussions:- Lean enterprise, Assignment Help, Ask Question on Lean enterprise, Get Answer, Expert's Help, Lean enterprise Discussions

Write discussion on Lean enterprise
Your posts are moderated
Related Questions

Manual override relays: When the manual-override relays are not energised, this current flows through brushes riding on slip rings mounted on the propeller spinner bulkhead and

simplify using quine Mccluskey tabulation algorithm and find out the number of primes implicants f(a,b,c,d)=(2.3,4,5,13,15)+d(8,9,10,11) in logic design

i want 5 question for clipper and clamper along with their solution

Spinning Reticle Seekers  A spinning reticle seeker contains a single thermal detector and a spinning patterned disk - such as the ‘Rising Sun' Reticle.   - consis

A project has a first cost of $2000. There is another cost at the end of year 1 of $500 and the income for year 3 until 6 year is $1000 per year. If the compounding is quarterly, c

i am building the above mentioned system and i intend using an arduino board together with the gsm shield. my problem is i don''t know if there is a way i can control a camera by p

what is the basic operation of gas turbine engine?

Class Number Arrangement   Unlike the Cities Numbers of Dewey Decimal Classification the Colon Class Numbers have not only Arabic Numerals but also capital letters of the Roman

The experimental set-up of Electron-beam welding. In the electron-beam process, electrons are emitted from the heated filament called the cathode and then focused into a beam wh