Attempt to tighten only the bolts contained within an arc that includes the leak area plus one or two bolts either side of the leak to the original torque values. A criss-cross torquing sequence should be used. If the leak does not stop, repeat the torquing procedure using increments of 50 ft-lbs. (68 N-m) up to the maximum over torquing value.

If the bolts cannot be tightened, the stud bolts contained in the arc of the leak shall be removed one at a time and cleaned or replaced if damaged. Lubricate the bolts and reinstall. Torque the bolts to the full torque value. Follow the same torquing sequence as above. Repeat the sequence using increments of 50 ft-lbs. (68 N-m) up to the maximum over torquing value.

If no results are achieved, go to the bolt on the flange directly opposite to the center of the leak, loosen it and retighten it to its proper torque. Ten, working one bolt at a time on opposite sides of the first bolt, readjust all the bolts on the side of the flange opposite the leak. It may be necessary to repeat this operation to get even bolt loading. When this operation is complete, go back to the bolt in the center of the leak and retighten as outlined above.

If these procedures are still not successful in stopping the leak, consider using hot/cold setting compounds with special enclosures or taking the piping system out of service for permanent repair.


Related Discussions:- Leak repair torquing procedure

Design lay-down areas for plant, Q. Design lay-down areas for plant? De...

Q. Design lay-down areas for plant? Designated lay-down areas are areas specifically positioned to enable equipment maintenance to be carried out. These are normally assigned f

Back Rake Angle, Why is back rake angle preferred to be negative for brittl...

Why is back rake angle preferred to be negative for brittle materials?

Design concrete pedestal for steel column carrying dead load, Design a conc...

Design a concrete pedestal for a steel column carrying a dead load of 600 kN and an imposed load of 600 kN. Assume the base plate is 350 mm x 350 mm M20 grade concrete and F e , 41

Define advantage and disadvantage of electron beam machining, Define Advant...

Define Advantage and Disadvantage of Electron Beam Machining Advantage  1. Suitable for automatic machining. 2. Absence of mechanical contact between work piece and too

I.c.engine.., proell governor,porter governor,watt governor

proell governor,porter governor,watt governor

Optimal feeder geometry, PART A A new process plant for ore processing ...

PART A A new process plant for ore processing is currently being planned. The design is only in the first stage. However, three requirements have already been clearly stated:

Maximal conductances and reversal potentials, By introducing their model of...

By introducing their model of neural excitability in 1952, Alan Lloyd Hodgkin and Andrew Huxley not only shed light on the mechanism underlying a very important phenomenon in Physi

Determine hardness of material, Determine hardness of material: Hardne...

Determine hardness of material: Hardness is surface property. It can be defined as resistance of material against permanent deformation of surface in the form of scratch, inde

Show pneumatic test, Q. Show Pneumatic Test? Pneumatic testing presents...

Q. Show Pneumatic Test? Pneumatic testing presents hazards that must be addressed as part of the engineering design of the pressure vessel. Due to the additional hazards of

Production engineering, what are the finishing operation in construction of...

what are the finishing operation in construction of telephone receivers?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd