Keywords related to water transportation, Civil Engineering

Keywords related to water transportation:

Oceanic Shipping: Shipping taking place in the oceans.

Coastal Shipping: Shipping taking place along the coast line.

Inland Water Transport: Water transport along rivers, canals, backwaters and bays.

Port: A facility where ships can berth and handle cargo and passengers.

Harbour: A place where ships can be moored and sheltered from the wind and waves.

Dock: An enclosure for the reception of ships.

Dry Dock: A dock which can be rendered dry for repair of ships.

Jetty: A structure projecting into the sea from the shore.

Wharf: A continuous structure like a retaining wall along a shore line to allow ships to berth.

Transit Shed: A shed for temporarily storing cargo discharged from ships and cargo received for loading to ships.

Warehouse: A shed for storing cargo for longer period.

Entrance Channel: A channel for ships to enter a sheltered harbour.

Turning Basin: An area where ships can turn.

Breakwater: Artificial structure constructed in the sea to protect ships from the effect of waves and storms.

Lock Entrance: An entrance to a dock with facilitating for closing and opening gates at either end.

Dock Wall: A retaining wall at the edge of a dock.

Posted Date: 1/23/2013 2:13:19 AM | Location : United States







Related Discussions:- Keywords related to water transportation, Assignment Help, Ask Question on Keywords related to water transportation, Get Answer, Expert's Help, Keywords related to water transportation Discussions

Write discussion on Keywords related to water transportation
Your posts are moderated
Related Questions

Q. Purpose of tar in bituminous materials? Tar is usually incorporated in bituminous materials due to the below reasons: (i)  Blending of tar with bitumen possesses better b

how to carry on leveling using dumpy level????????????

how surface water can be controlled in road pavement


construct parabolic shapes using the envelop method and the offset method with dimensions 80 by 120

A section view of a proposed roadway is shown in Figure 1 with an existing grade point elevation of 100-ft. The proposed roadbed finish grade elevation at station 50+00 is 95.00-ft

Explain the Statements about the Construction Contract Process I. Surety bond assures the project owner a guarantee of funds equivalent to a promissory note. The surety bond is

Water Absorption Test: In this test cube specimen weighing approximate 50 grams are prepared and the test is carried out in the steps following: 1.    Note down the weigh

Q. Purpose of reinforcement in concrete roads? The major purposes of reinforcement in concrete roads are: (i)  To control the development and pattern of cracks in concrete p