Keywords of airport management, Civil Engineering

Keywords of Airport management:

Air Traffic Control: A system by which air routes, flight rules for flying aircraft and navigational facilities are provided in an airport.

Landing System: A system facilitates by which an aircraft can land.

VASI: Visual Approach Slope Indicator for facilitating landing by aircraft.

Passenger Terminal Building: A facility wherein passenger are serviced in an airport.

Airport Lighting: Lighting of various components of an airport.

Lighting of Approach to runway: A system of lights at an approach to Runway facility landing of aircraft.

Runway Lighting: Lighting of runway.

Taxiway Lighting: Lighting of taxiway.

Apron Lighting: Lighting of apron.

Airport Pavement Maintenance: Operations covering various aspects of maintenance of airport pavements.

Heliport: A facility for landing and take-off of helicopters.

STOL Port: Short Take-off and Landing facility.

Posted Date: 1/23/2013 1:52:54 AM | Location : United States







Related Discussions:- Keywords of airport management, Assignment Help, Ask Question on Keywords of airport management, Get Answer, Expert's Help, Keywords of airport management Discussions

Write discussion on Keywords of airport management
Your posts are moderated
Related Questions
Reinforcement in thrust blocks In general situation, reinforcement isn't essential for thrust blocks in pressurized pipelines. Though certain amount of reinforcement hasto be

Q. Purpose of dowel bars in elastomeric bearing? Elastomeric bearing is generallycategorized into two types: free andfixed. For fixed types bridge deck is permitted only to rot

Q. Local Scour at obstructions in rivers? When the water flow in river is deflected by obstructions such as bridge piers, scouring would occur arising from formation of vortexe

explain about forces acting on a piling wall

stress strain curves for any materials with an explanation

Question What are main functions of cap block drive cap and pile cushion in driven piles? Answer Cap block is fit amid hammer end and drive cap to manage hammer bl

State the term - Relaxation of Stress in Steel If we keep a high-tensile steel wire stretched and maintained at a constant strain, the value of the force in the wire does not


The Table provides the cross-sectional areas to be excavated for the roadway construction. The volume of earth to be excavated (yd 3 ) between section 83+65.6 and 85+98.5 is most n