Keywords of airport management, Civil Engineering

Keywords of Airport management:

Air Traffic Control: A system by which air routes, flight rules for flying aircraft and navigational facilities are provided in an airport.

Landing System: A system facilitates by which an aircraft can land.

VASI: Visual Approach Slope Indicator for facilitating landing by aircraft.

Passenger Terminal Building: A facility wherein passenger are serviced in an airport.

Airport Lighting: Lighting of various components of an airport.

Lighting of Approach to runway: A system of lights at an approach to Runway facility landing of aircraft.

Runway Lighting: Lighting of runway.

Taxiway Lighting: Lighting of taxiway.

Apron Lighting: Lighting of apron.

Airport Pavement Maintenance: Operations covering various aspects of maintenance of airport pavements.

Heliport: A facility for landing and take-off of helicopters.

STOL Port: Short Take-off and Landing facility.

Posted Date: 1/23/2013 1:52:54 AM | Location : United States







Related Discussions:- Keywords of airport management, Assignment Help, Ask Question on Keywords of airport management, Get Answer, Expert's Help, Keywords of airport management Discussions

Write discussion on Keywords of airport management
Your posts are moderated
Related Questions
CASTE DISCRIMANIMATION


Q. Explain the design of graded filter? Use of graded filter has been traditionally used below the revetment and protection works. The material used in the granular / graded fi

Overview   A structure is required to support a conveyor and various ancillary equipment, between two buildings in an industrial area. It is 12m long and made up of structural s

Define the Combustion of Solid Waste? A chemical reaction in which the elements in fuel oxidize in presence of excess oxygen C → CO 2 , H → H 2 O, S   → SO x , N → NO x

Q. Preloading - Control of settlements? This method consists of loading the soil strata by a load intensity which will be equal to or higher than the expected load intensity. T

The transmission main from the well field to the community is 2500 ft, the velocity of flow at peak pumping capacity is 3.5 fps, water temperature is 10oC, and pH is 7.5. If free c

A simply-supported beam (AB) with an overhang (BC) is illustrated in Figure 1(a), with the cross-sectional details given in Figure 1(b). The dead load comprises self weight only; f

Explain the Basic requirement of Design of shock transmission unit? The STU must withstand the specified design load. The stroke of the piston must be bigger than the movement

Explain the Driver Expectancy A fundamental component of driver information processing and perception. Drivers operate with a set of expectancies, e.g.: 1) Freeway exits wil