Keywords of airport management, Civil Engineering

Keywords of Airport management:

Air Traffic Control: A system by which air routes, flight rules for flying aircraft and navigational facilities are provided in an airport.

Landing System: A system facilitates by which an aircraft can land.

VASI: Visual Approach Slope Indicator for facilitating landing by aircraft.

Passenger Terminal Building: A facility wherein passenger are serviced in an airport.

Airport Lighting: Lighting of various components of an airport.

Lighting of Approach to runway: A system of lights at an approach to Runway facility landing of aircraft.

Runway Lighting: Lighting of runway.

Taxiway Lighting: Lighting of taxiway.

Apron Lighting: Lighting of apron.

Airport Pavement Maintenance: Operations covering various aspects of maintenance of airport pavements.

Heliport: A facility for landing and take-off of helicopters.

STOL Port: Short Take-off and Landing facility.

Posted Date: 1/23/2013 1:52:54 AM | Location : United States







Related Discussions:- Keywords of airport management, Assignment Help, Ask Question on Keywords of airport management, Get Answer, Expert's Help, Keywords of airport management Discussions

Write discussion on Keywords of airport management
Your posts are moderated
Related Questions
Q. What are the causes of settlement? The various causes of settlement are: 1) increasing load on the surrounding soil deposit, 2) excavation, 3) lowering of water tab

isolated footing

earthen dam and gravity dam

rebound hammer working mechanism with detailed specifications of the images

how to calibrate AGGREGATE IMPACT VALUE TESTING MACHINE

which kind of pile can increase the bearing capacity, if the water level high in sang soil surface?

How Will You Influence People to Strive Willingly for Group Objectives in Your Organization (Target Based Industry)? Apply Your Interpersonal Influence Through Communication Proces

A No 10 steel rebar is tested in tension by monitoring the load reading of the testing machine it was found that the specimen yielded at aload of 41600lb and fractured at 48300 lb

Q. Draw a neat dimensioned cross-sectional sketches of a - i. New single Line B.G. track in a cutting on a mainline route. ii. New double Line B. G. track on a trunk route ha

Determine the Strain Compatibility method For estimating the ultimate strength of prestressed concrete members in flexure, 'Strain Compatibility method' may be used. For calcul