Key words used in road under special conditions, Mechanical Engineering

Keywords used in appropriate technology:

Hill Roads : Roads in hilly and mountainous terrain.

Landslides : The slippage of mass of hill face.

Retaining Walls : Structures constructed to retain the fill portion in hill roads.

Breast Walls : Structures constructed to buttress uphill slopes of hill roads.

Check Walls : Small retaining structures provided in series to arrest landslides.

Gabion Walls : Walls made up of stones encased in wire mesh or geogrid cages.

Parapet Walls : Walls constructed for protecting vehicles from falling into the valley in hill roads.

Marshy Area : Area which is water-logged and swampy.

Sand Drains : Vertical drains constructed to facilitate upward movement of water from underlying saturated soil.

Dunes : Mounds formed by deposit of wind-blown fine sand in deserts.

Gravel Roads : Roads having a surfacing of naturally occurring or blended material.

Appropriate Technology : Technology using equipment like tractors, disc harrows, tillers, rooters and rotavators.

Posted Date: 1/22/2013 6:22:11 AM | Location : United States







Related Discussions:- Key words used in road under special conditions, Assignment Help, Ask Question on Key words used in road under special conditions, Get Answer, Expert's Help, Key words used in road under special conditions Discussions

Write discussion on Key words used in road under special conditions
Your posts are moderated
Related Questions
Q. Process of Alloy Materials Sampling? The following alloy-materials require a minimum of 10% per lot representative PMI sampling. If any incorrect material is found in repres

Determine elongation because of self weight of conical bar: Sol.: Consider conical bar ABC of length L with the diameter d fixed rigidly at AB . Let attention be focuse

(a) Explain safety features of latest vehicles. (b) Discuss the advantages and disadvantages of front wheel drive vehicles over rear wheel drive vehicles.

A force F(t) is suddenly applied to a mass m which is supported by a spring with a constant stiffness ‘K'. After a short period of time T, the force is suddenly removed. In the mea

A 3-phase, 15-kV, 4-pole, cylindrical rotor synchronous generator is connected to a 50-Hz infinite bus. The synchronous reactance of the machine is X s = 0.6 ohms per phase and th

Project Quality Plan Design verification requirements for a project are to be established in the Quality Plan sub-section of the Project Execution Plan. The Lead Mechanical E

A centrifugal clutch is to be prepared to transmit 15 KW at 900 r.p.m. The shoes are four in number. The speed at which the engagement begins is 3/4 th of the running speed. The in

Tunnels: Tunnels become unavoidable for negotiating hills, where detours are costly. The tunnels in rock are not lined, but those in loose strata require a lining of cement c

cases of equilibrium with explaination