Kanban System

 The work kanban literally means visual record usually kanban is loosely referred to as a card system. Kanban is the production control system that pulls JIT production allowing production with smaller inventories.

Two card kanban : In the Toyota production system for example inventory is closely controlled at low levels by suing a manual two card knaban system. One kind of card the conveyance kanban is similar to a requisition and authorizes the transference of materials from a supplying work centre to a using work centre. A second card the the production kanban authorizes the production of materials to replace those that ware transferred earlier.

Materials are transferred and produced in bins and for each item in the production process are a prescribed number of bins in circulation at any one time. In addition each bin houses a prescribed quantity say four units of materials. By choosing the number of bins and the prescribed quantities in them inventories are carefully and visibly controlled on the shop floor. By reducing the number of card circulating between two interacting work centers in process inventories approach zero and the needed parts, or final products do not exist. Stockless production is a major feature in the pull system of planning and control.

Single card Kanban : In contrast to the two cards systems a single card kanban system uses only a conveyance ( or move) kanban and no production kanban. While Toyota and a few other companies use the two card system single card kanban is the most often used.

Posted Date: 3/1/2013 4:08:01 AM | Location : United States







Related Discussions:- Kanban system, Assignment Help, Ask Question on Kanban system, Get Answer, Expert's Help, Kanban system Discussions

Write discussion on Kanban system
Your posts are moderated
Related Questions
Another important decision is maintaining inventory and determining the inventory level. An inventory level is a quantitative limit, which should neither be much higher nor

Problem 1: "ISO 9001:2000 is an international standard having wide positive effects regardless of the underlying mechanism." Discuss. Problem 2: Describe: (i)  Five ste

outline with example four main barriers to communication

Attend to machines predominantly only when the machines breakdown ( breakdown maintenance or BM) Breakdown maintenance = BM

It goes by many terms - information overload, analysis paralysis, data dumping, and so on. You know what we''re talking about. It is indeed greater to live in the information age w

Question 1: "Training is usually treated as a cost in many organizations rather than an investment since in difficult times, many organizations cut their training budget first

Q. Conflicts in Profit versus Value Maximization Principle? 1) Conflict between Departmental Goal and Firm Goal: There are several departments in affirm such as sales departmen

Probelm 1: Show the official roles of the chairperson, the secretary and members before, during and after formal meetings. Probelm 2: Consider that you are the team lea

Satine Enterprise Ltd. a) Reducing balance method: Year Depreciation Net Book Value 0 0 $25,000

Identify the best organizational structure: Q. Southern Industrials Ltd. wants to develop a competency-based approach to executive selection. Which leadership perspective main