Joints in concrete carriageway, Civil Engineering

Assignment Help:

Question

Is it necessary joints of concrete kerbs be in line with joints in concrete carriageway?


Answer

In regular practice, joints are provided in road kerbs to cater for concrete expansion and contraction. Though, location of joints in kerbs is not arbitrary and they must match with joints in concrete carriageway. Or else, it is extremely likely that cracks might form in concrete kerbs at place of pavement joints.


Related Discussions:- Joints in concrete carriageway

Air infiltration, Using Matlab/ Simulink software, verify the heating requi...

Using Matlab/ Simulink software, verify the heating requirement (kW) for the building because of  air infiltration and natural ventilation. Note that this needs you to estimate air

Embankment, Describe the various steps in embankment construction.

Describe the various steps in embankment construction.

Cargo handling facilities, Cargo Handling Facilities: All water transp...

Cargo Handling Facilities: All water transport terminals require cargo handling facilities. Cranes of various sizes are used. In docks, traveling cranes are popular (Figure).

Thermocouples are utilized for the measurement of what, Thermocouples are u...

Thermocouples are utilized for the measurement of what temperature? Answer: It is utilized for the measurement of temperature.

Contractor to continue concreting works, Question If on-site slump test fai...

Question If on-site slump test fails, is it necessary that engineers allow a contractor to continue concreting works ? Answer This is an extremely traditional question raised by

What is floating foundation, Explain the procedure of determining the safe ...

Explain the procedure of determining the safe bearing capacity based on the standard penetration test. Write short note on (i) Floating foundation and (ii) Factors affecti

Explain damage inspections - underwater inspection of bridge, Explain the D...

Explain the Damage inspections - underwater inspection of bridge? Sometimes referred to as post-event inspections, damage inspections are typically unscheduled inspections aime

Computer programming, write algorithm and flowchart that displays your name...

write algorithm and flowchart that displays your name 10 times

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd