international business, Other Engineering

VK Ltd a multi product company, furnishes you the following data relating to the year 2000.

First half sales Second half sales
Sales Rs.45000 Rs.50000
Total cost Rs.40000 Rs.43000

Assuming that there is no change in price and variable costs and that the fixed exepenses are incurred equally in the two half year periods calculate for the year 200

1 The Profit Volume Rations
2 Fixed Expenses
3 Break Even Sales
4 Percentage of margin of safety
5 Marks each
Posted Date: 5/19/2012 5:45:24 AM | Location : United States







Related Discussions:- international business, Assignment Help, Ask Question on international business, Get Answer, Expert's Help, international business Discussions

Write discussion on international business
Your posts are moderated
Related Questions
What is the internal rate of return (IRR) of eurekaforbes? Inner Amount of Come back is that rate of Come back at which the net provide value is similar to Zero or it is the Amo


N e w Assembly Buildings: 12.1.1.1 The requirements of this chapter shall apply to new buildings or portions thereof used as an assembly occupancy. 12.1.3.2 Simultaneous

Fire fighting operations - high rise buildings: Inlets that allow the fire service to supplement to water to the sprinklers and to the fire mains are useful additions to the m

Electromagnetic Spectrum: Visible light belongs to a family of waves known as the electromagnetic spectrum. Other members of this family include high frequency short wavelength

Plastic molds are made of plaster of Paris (gypsum) or calcium sulphate, talc and silica flour is added in the plaster of Paris to improve strength and to control the time required

HELP IN ELECTRONIC...I AM DOING ELECTRONIC ENG. ... GUIDE ME THE WAY...

what type of projects are take place in the chemical engineering

Combustion section: The combustion chamber has the difficult task of burning large quantities of fuel, supplied through the fuel burners, with extensive volumes of air, supplie

Testing After Install After installation of a propeller, the engine must be ground run in order to check the propeller for correct function and operation.  Aircraft propeller in