Installation of meters and verification of connections, Electrical Engineering

Installation of Meters and Verification of Connections

Apart from testing and calibrating the meters they must be properly installed as per the links diagram. The points in which must be kept in view although meters are installed are given below.

Installation of Meters

a) Position of meter should be such in which reading is simply visible.

b) Mounting of meter should be on solid wall or DP structure or on panel board.

c) Vertical mounting of meters should be ensured. The utility engineer should use a plumb bob and mark a vertical line prior to installation. He could also use a spirit level and put on the top of the meter after hanging on the screw hole. Instead, he should put spirit level on the edge of the terminal block to ensure vertical mounting.

d) For HT metering equipment, CTs should be right on the incoming side before the point of isolation.

e) The meter box should be sealed.

f) The meter recording should be checked at site.

Posted Date: 2/6/2013 8:09:58 AM | Location : United States







Related Discussions:- Installation of meters and verification of connections, Assignment Help, Ask Question on Installation of meters and verification of connections, Get Answer, Expert's Help, Installation of meters and verification of connections Discussions

Write discussion on Installation of meters and verification of connections
Your posts are moderated
Related Questions
it''s 3 assignments and each assignment have 7 questions so each assignment have 1 hour when I open it I have only 1 hour to finish it I can show him or her the practice question t

Explain Contact resistance. Contact resistance: It is measured as the voltage drop from tail to tail of the mated contacts along with specified current flowing through the cont

Aims More practice using data movement and control flow statements. Understand techniques to interface microprocessors with external switch-based hardware. Write P

Parallel Operation of Interconnected Synchronous Generators In order to assure continuity of the power supplywithin prescribed limits of frequency and voltage at all the load p

Q. Find load resistance and voltage? Let the amplifier block be connected to a current source at the input terminals, as shown in Figure(a), and to a load resistance R L at it

Absolute permittivity (ε):  Permittivity is a capacitance or ability to kept energy of a capacitor.  A force was also generated, called as electric force and the symbol. It d

Q. Consider themagnetic circuit of Figure. Let the cross-sectional area AC of the core, be 16 cm 2 , the average length of the magnetic path in the core lC be 40 cm, the number

Can we use ohm''s law for AC CIRCUITS?

Question: (a) Explain the following metrics: (i) Throughput (ii) Latency (iii) IPC (b) Of the three factors in the equation (EXCPU = Number of instructions × CPI × cy

Q. Why a common collector amplifier is called an emitter follower?         When the input voltage goes through its positive half cycle, the output voltage is also seen to go th