Installation of Meters and Verification of Connections

Apart from testing and calibrating the meters they must be properly installed as per the links diagram. The points in which must be kept in view although meters are installed are given below.

Installation of Meters

a) Position of meter should be such in which reading is simply visible.

b) Mounting of meter should be on solid wall or DP structure or on panel board.

c) Vertical mounting of meters should be ensured. The utility engineer should use a plumb bob and mark a vertical line prior to installation. He could also use a spirit level and put on the top of the meter after hanging on the screw hole. Instead, he should put spirit level on the edge of the terminal block to ensure vertical mounting.

d) For HT metering equipment, CTs should be right on the incoming side before the point of isolation.

e) The meter box should be sealed.

f) The meter recording should be checked at site.

Posted Date: 2/6/2013 8:09:58 AM | Location : United States







Related Discussions:- Installation of meters and verification of connections, Assignment Help, Ask Question on Installation of meters and verification of connections, Get Answer, Expert's Help, Installation of meters and verification of connections Discussions

Write discussion on Installation of meters and verification of connections
Your posts are moderated
Related Questions
Q. Explain Fourier Series? The phasor method of circuit analysis can be extended (by using the principle of superposition) to find the response in linear systems due to nonsinu

1) Draw the state diagram for the state machine described by Table 7.5 in the text. Note, the table shows the transition to the next state S* from the current state S for the next

Q. For the circuit shown in Figure(a), determine the diode current and voltage and the power delivered by the voltage source. The diode characteristic is given in Figure.

Discuss the role of a bus arbiter in a multiprocessor configuration. Bus arbiter: It functions to resolve priority among bus masters and permits only one device at a time to

Q. What is Non-Folded Network? Non-Folded Network: In a switching network, all outlet/inlet connection may be used for inter exchange transmission. In such a case, exchange d

Define some Applications of Digital Counters? Digital counters are extremely useful in many applications. They can be effortlessly found in digital clocks and parallel-to-seri

i have to design a project title "Edge determining techniques for Low quality images in different lighting conditions and we use matlab for images simulation by changing different

how do I find the ic and ve

Calculate the cross-sectional area, in mm 2 , of a piece of aluminium wire 100 m long and having a resistance of 2Ω. Take the resistivity of aluminium as 0.03 x 10-6 Ωm.

Establish the relationship between duty ratio and output voltage