Installation of meters and verification of connections, Electrical Engineering

Installation of Meters and Verification of Connections

Apart from testing and calibrating the meters they must be properly installed as per the links diagram. The points in which must be kept in view although meters are installed are given below.

Installation of Meters

a) Position of meter should be such in which reading is simply visible.

b) Mounting of meter should be on solid wall or DP structure or on panel board.

c) Vertical mounting of meters should be ensured. The utility engineer should use a plumb bob and mark a vertical line prior to installation. He could also use a spirit level and put on the top of the meter after hanging on the screw hole. Instead, he should put spirit level on the edge of the terminal block to ensure vertical mounting.

d) For HT metering equipment, CTs should be right on the incoming side before the point of isolation.

e) The meter box should be sealed.

f) The meter recording should be checked at site.

Posted Date: 2/6/2013 8:09:58 AM | Location : United States

Related Discussions:- Installation of meters and verification of connections, Assignment Help, Ask Question on Installation of meters and verification of connections, Get Answer, Expert's Help, Installation of meters and verification of connections Discussions

Write discussion on Installation of meters and verification of connections
Your posts are moderated
Related Questions
Define instruction cycle and T-state Instruction cycle is defined, as the time needed completing the execution of an instruction. Machine cycle is defined as the time needed co

Q. What are frequency response curves? How are they made? Every amplifier has a frequency-response curve associated with it. They provide a "picture" of the performance of an a

Consider a simple zener voltage regulator with the circuit diagram shown in Figure (a). (a) For a small reverse resistance R Z S and V S - R S i out > V Z , show that v ou

Calculate the N.A of a step index fibre having n 1 =1.48 and n 2 =1.46. What is the maximum entrance angle ψ max for this fibre if the outer medium is air with n 1 =1.0? Given

INR (Increment )  Instruction This  instruction is used to  increment  the contents  of any  register or memory  location by one. There  are two  format.

a. Discuss the benefits and limitations of utilizing wind energy for electricity generation. b. Draw the block diagram representation of a thermal power generation unit. Illustr

Switching Characteristics Switching  characteristics are also know  as dynamic or transient characteristics these  characteristics give  the information  about the  time  varia

Safe Conduct : what if a trailing flex became caught up in an apparatus trolley and was cut? Or someone splashed water onto a plug, or concentrated sulphuric acid onto a flex? F

Give the properties and application of bronze. Bronze : It is alloy of copper and tin. This alloy is very brittle and hard. Its corrosion resistance is better than brass. Bron