Installation of Meters and Verification of Connections

Apart from testing and calibrating the meters they must be properly installed as per the links diagram. The points in which must be kept in view although meters are installed are given below.

Installation of Meters

a) Position of meter should be such in which reading is simply visible.

b) Mounting of meter should be on solid wall or DP structure or on panel board.

c) Vertical mounting of meters should be ensured. The utility engineer should use a plumb bob and mark a vertical line prior to installation. He could also use a spirit level and put on the top of the meter after hanging on the screw hole. Instead, he should put spirit level on the edge of the terminal block to ensure vertical mounting.

d) For HT metering equipment, CTs should be right on the incoming side before the point of isolation.

e) The meter box should be sealed.

f) The meter recording should be checked at site.

Posted Date: 2/6/2013 8:09:58 AM | Location : United States







Related Discussions:- Installation of meters and verification of connections, Assignment Help, Ask Question on Installation of meters and verification of connections, Get Answer, Expert's Help, Installation of meters and verification of connections Discussions

Write discussion on Installation of meters and verification of connections
Your posts are moderated
Related Questions
Program counter holds the address of either the first byte of the next instruction to be fetched for implementation or the address of the next byte of a multi byte instruction, whi

8085 is a one address microprocessor. In 8085 interrupts are classified by hardware and software interupts.

Q. A silicon npn BJT is biased by the method shown in Figure, with R E = 240 , R 2 = 3000 , and V CC = 24 V. The operating point corresponds to V BEQ = 0.8V, I BQ = 110 µA,

What is meant by doping? Doping: Semiconductors in its extremely pure form are termed as intrinsic semiconductor such intrinsic semiconductor to which several suitable impur

A 9.1V zener diode has a nominal voltage fall at a test current of 28mA. The internal resistance of the zener diode is 5 ohms. Find the voltage drop across the zener diode at zener

Q. Explain about Register marker? Register marker: Stronger selectors perform searching and counting . Though, the crossbar switch has no ‘intelligence'. Something external to

how do you define the expertise for this hot line maintenance?

Q. Explain about For Loop Construct? The loop build causes the for loop to be splitted into portions and portions shared amongst threads in team. The syntax of loop construct

Mixed Mode Simulator: The circuit is preprocessed. The test points and waveform markers are located in input and output of the circuit. GND net is set like reference net.

Designated Consumers - Features of Energy Conservation The Act gives the list of designated consumers, which involves the energy intensive industries, Railways, Port Trust, Tr