Information engineering, Software Engineering

Information engineering is a system  engineering approach which is used to describe architectures which enable a business to use data professionally. The intent of information engineering is to get comprehensive data application architecture, architectures and a technology infrastructure which will meet the requirement of the business strategy and the goals and objective of every business area.   Information engineering encompasses information strategy planning analysis application specific, business field analysis which is really element of software engineering.

Posted Date: 10/20/2012 6:33:18 AM | Location : United States







Related Discussions:- Information engineering, Assignment Help, Ask Question on Information engineering, Get Answer, Expert's Help, Information engineering Discussions

Write discussion on Information engineering
Your posts are moderated
Related Questions
Explain Respiratory quotient? Ans) Respiratory quotient is the ratio among the carbon-dioxide used in photosynthesis to the quantity of oxygen liberated in respiration.

The act of attempting to verify the cause of the symptoms of malfunctions noticed by testing or by frenzied user complaints.

RE-ENGINEERING:- It is re-organizing and changing existing system to make them more maintainable. It includes:-  Source code translation. Program structure development



Describe how the goals of quality control (QC) flexible manufacturing systems (FMS), design for assembly (DFA)and low overall costs can be best combined by computer integrated manu

What are the benefits of prototyping? i. Prototype serves as a basis for deriving system specification. ii. Design quality can be improved. iii. System can be maintained

Define Data Flow Diagram. A Data flow diagram is a graphical description that depicts information flow & the transforms that are applied as data move from input to output. T

QUESTION - Characteristics of DSs (a) List and describe any 4 characteristics of distributed systems. (b) State the criterion for a system to be considered as not a distrib

Sir I need a Basic Ready made Time Line Chart for Online Shopping Management Project Because I have to submit the Project Report on 8 April 2013 So can u provide some urgent help n