IMPORTANT TERMS:

Fire Box: Place where fuel is burnt.

Grate : The fuel is burnt on this.

Baffles: Plates are used for directing the flow of flue gasses.

Chimney: For ensuring that spent flue gasses exit the boiler at reasonable height. It helps in creation of natural draught.

Damper: Regulates amount of air through chimney.

Headers: Pipes which are connected to tubes and drums.

Tubes: For enabling the transfer of heat from the flue gasses to water.

Shell: The cylindrical vessel which has water to be converted to steam.

Mountings: For guaranteeing safe and satisfactory performance

Safety Valve: It releases steam if pressure inside boiler exceeds certain design limits. It can be of dead weight, spring loaded and lever types.

 

Posted Date: 10/20/2012 2:46:21 AM | Location : United States







Related Discussions:- Important terms related to boiler, Assignment Help, Ask Question on Important terms related to boiler, Get Answer, Expert's Help, Important terms related to boiler Discussions

Write discussion on Important terms related to boiler
Your posts are moderated
Related Questions

Tributary lateral load:   The question is on a fictitious 1965 building in Albany, NY. It was designed using the 1964 State Building Construction Code, in which Allowable Stress

Explain about the Deep foundation Deep foundations are those where the depth D is much larger than B. Piles, wells, piers and caissons belong to this group.

PROBLEM DEFINITION Inspiration for a product is most often the result of meeting a particular need or problem that existing products are not able to satisfy. When defining a

Explain the Disadvantages of Automation? a) Initial cost is higher providing additional features in machine tools. b) Skilled personnel's are required for maintenance of aut

A steel dia 10 mm passes through a brass tube of internal dia 15mm and external dia is 25 mm. The bolt is tightened by a nut. The length of tube is reduced by 1.5mm and the length

Master Production Schedule: A manufacturing unit produces two products M and N on generates to stock basis. The estimated demand for the product M and N over the next six week

Explain the Principle of screw conveyer When materials are feed into the fixed chutes, due to action of gravity of materials and the friction force between material and chute t

Evaluate the speed of train: A train of mass 200KN has frictional resistance of 5N per KN. Speed of train, at the top of an inclined of 1 in 80 is 45 Km/hr. Find speed of tra

What the necessary condition for a heat transfer process to occur?