Impact of poor maintenance, Mechanical Engineering

1. Production Capacity : Machines idled by breakdowns cannot produce thus the capacity of the systems is reduced.

2. Production cost: Labor costs per unit rise because of idle labor due to machine breakdown the machine malfunction result in scrub unit labor and material costs increase. Because cost of maintenance which includes such costs as costs of providing repair facilities repair crew preventive maintenance inspection spare parts and stand by machines will increase as machines break down frequently.

3. Product and Service Quality: Poorly maintained equipments produce low quality products. Equipments that have not been properly maintained have frequent breakdown and cannot provide adequate service to customers.

Posted Date: 3/25/2013 4:03:01 AM | Location : United States







Related Discussions:- Impact of poor maintenance, Assignment Help, Ask Question on Impact of poor maintenance, Get Answer, Expert's Help, Impact of poor maintenance Discussions

Write discussion on Impact of poor maintenance
Your posts are moderated
Related Questions
Components of power plant &it''s functions

About zeroth law of thermodynamics

Dear Sir I would to know what is the min. time required for carbon steel tube A214 @ zero C to 50 C

Calculate the overall fraction defective from all of sample: ABC insurance company desires to design a control chart to check whether insurance claim forms are being correctly

two forces are acting at a point''o'',determine magnitude and direction by using parallelogram law of forces and triangular law of forces

Maximum Extraordinary Effect Determine the direction of propagation in quartz (ne = 1.553 and no = 1.544) at which the angle between the wave vector k and the Poynting vector S


Name The Boolean Set Operators used in CSG The Boolean Set Operators used are : union : A + B is the set of points that are in A or B. intersection : A . B is the s

INTRODUCTION TO WELDING PROCESSES Welding is a material joining process used in making welds and a weld is a localised coalescence of metals or non metals produced either by he

What is the total value added by the new workshop in Year 1 of the 5-year plan? Assuming that the average quarterly demand is maintained over the remaining years of the 5-year p