i need answer for the below question, Operation Research

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper in a week. There are 160 production hours in a week. It requires 0.20 and 0.40 hours to produce a ton of grade X and Y papers. The mill earns a profit of Rs. 200 and Rs. 500 per ton of grade X and Y paper respectively. Formulate this as a Linear Programming Problem.
Posted Date: 2/20/2013 12:18:25 PM | Location :







Related Discussions:- i need answer for the below question, Assignment Help, Ask Question on i need answer for the below question, Get Answer, Expert's Help, i need answer for the below question Discussions

Write discussion on i need answer for the below question
Your posts are moderated
Related Questions
give me an example of pre-modelling, modelling and post modelling phases

Small Sample The central limit  theorem does not work well  with small  samples  even if  the  population  in non Gaussian. So  we cannot  rely on the central limit theorem

The 2 nd phase of operations Research is to construct a mathematical model representing the system under study. It requires the identification of both static and dynam

Degree of  Correlation ship 1. Perfect Correlation: When  changes  in  two related variables are  exactly  proportional  there is  perfect correlation between  them. In case

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

Six Operators are to be assigned to five jobs with the cost of assignment in Rs. given in the matrix below. Determine the optimal assignment. Which operator will have no assignment

The systematic methodology developed for an operation research study with problems involving conflicting multiple objective policies and alternatives. Operation research in

Solve the following Linear Programming Problem using Simple method. Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = 2 X1, X2 = 0

A factory employs unskilled workers earning $135 per week and skilled workers earning $270 per week. It is required to keep the weekly age bill below $24,300. The machine requires

Need Proposals are written for various reasons. They are prepared for different reasons which vary to the extent of details expected, but like research reports, the proposal a