Graphics Exchange Specification:

Afterwards, an open meeting was held at the National Academy of Sciences on October 10, 1979. About 200 people attended to herald the birth of IGES. There was atmosphere of extraordinary excitement, though not everyone was supportive. Additionally, although it was hotly debated, the name of this project was accepted eventually with the minor change from "Interim" Graphics Exchange Specification to "Initial" Graphics Exchange Specification.

After two critical reviews, the IGES team released its first draft in January 1980, having geometry, graphical data, and annotations. IGES was submitted to the ANSI Y14.263 committee for standardization that forced the committee to try to reconcile the very different views embodied by the IGES work and the work funded by CAM-I on boundary representation description. Whereas version one of IGES was standardized (Y14.26M-19814), the work funded by CAM-I was associated but uninterested with the remainder of the standard.

Posted Date: 1/25/2013 7:59:13 AM | Location : United States







Related Discussions:- Graphics exchange specification, Assignment Help, Ask Question on Graphics exchange specification, Get Answer, Expert's Help, Graphics exchange specification Discussions

Write discussion on Graphics exchange specification
Your posts are moderated
Related Questions
What are the different theories of failure under static load, explain briefly? The major theories of failure of a member subjected to bi-axial stress are as below: > Maximu

What do you mean by sensitivity in a governor?

(i) Describe Poisson's Ratio. (ii) A circular rod of 100mm diameter and 500 mm length is subjected to a tensile force of 1000 KN. Calculate the modulus of bulk modulus, rigidity

MODERN ARC WELDING POWER SOURCES Recent advances in the field of solid state power electronics have helped to improve the status of welding power sources. With the development rel

Third Gear Position: When gear M3 on the main shaft is in mesh with gear C3 on the counter shaft then this is known as third gear position. The fixed gear M3 rotates with mai

Why is it required of cooling the aeroplane ? Illustrate Boot-Strap Air Evaporative cooling system with neat sketch and T-S diagram.

Q. Qualifications of Welding Procedures? The Fabricator shall prepare and submit for review by Welding Procedure Specifications (WPS) and Procedure Qualification Records (PQR),

Resultant of Non-coplanar Force System: The resultant of a system of coplanar forces can be attained by adding up two forces through law of parallelogram at a time and after t

Determine Strain energy stored in coiled helical spring: For a close coiled helical spring subjected to an axial load of 200 N with 10 coils of wire of diameter 18 mm and buil

Temperatur e Scales: The temperature of a system can be determined by bringing a 2 nd body, a thermometer, into contact with the system and allowing thermal equilibrium to b